Table of Contents

Advertisement

Menu bar

This contains the various operations that are carried out by the E-TUBE PROJECT.
File
 Exit
This closes E-TUBE PROJECT.
Setting
 Application settings
1.
Set whether to display the confirm exit dialog box when exiting E-TUBE PROJECT.
2.
Set whether to confirm a firmware update when it is below the confirm update value at the
preset time.
3.
Set whether to automatically set the PC time when the cycle computer is connected.
4.
Set whether to use a proxy server for E-TUBE PROJECT API communications.
When this check box is selected,
5.
Use the proxy settings of Internet Explorer.
6.
When this radio button is s elected,
7.
Enter the address and port number of the proxy server to be used.
8.
Enter the User ID and password for connection to the proxy server.
ABOUT THE E-TUBE PROJECT OPERATION SCREENS
5, 6, or 8
can be entered.
7
can be entered.
5
6
14 / 34
1
2
3
4
7
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sm-pce1Sm-bcr2

Table of Contents

Save PDF