11. Place the middle brace between the right and
left skew boards, align the mounting holes,
and fasten each side with two
head screws, two flat washers and two hex
nuts as shown in Figure 12.
Middle
Brace
Figure 12. Installing middle brace.
12. Completely tighten all hardware now.
Work Table
Components and Hardware Needed:
Work Table .........................................................1
Flat Head Screws ¼"-20 x
Flat Washers
⁄
" .................................................4
1
4
Hex Nuts
⁄
"-20 ..................................................4
1
4
To install the work table:
1.
Fasten the work table hinges to the holes on
the front legs (Figure 13) using four
⁄
" flat head screws, four flat washers, and
5
8
four hex nuts.
-16-
⁄
"-20 x
⁄
" flat
1
5
4
8
Qty
⁄
" ............................4
5
8
⁄
"-20 x
1
4
Figure 13. Installing table.
Curtains
Components and Hardware Needed:
Curtains (Left, Top, Right) ..................................3
Connector Bars ..................................................2
Flat Washers
⁄
" .................................................8
1
4
Hex Nuts
⁄
"-20 ..................................................8
1
4
Flat Head Screws
⁄
"-20 x
1
4
To install the curtains:
1.
Fasten the upper and lower hinges (Figure
14) on the left curtain to the left skew board
with four
⁄
" -20 x
1
4
flat washers and four hex nuts.
Figure 14. Installing left curtain.
G0532 2HP Dry Spray Booth
Qty
⁄
" ............................8
5
8
⁄
" flat head screws, four
5
8