Download Print this page

Zennio ZVP-FFRA3 Assembly Instructions

Flush installation - frame - 3 modules

Advertisement

Quick Links

Flush installation - Frame - 3 modules
ZVP-FFRA3
Note: This product must be purchased together with the frame ZVP-FBOX3
ASSEMBLY OF FRAME (ONE-COLUMN LAYOUT)
1
Please remove the blind panels and the additional modules. After
that, assemble the additional module enclosures, opening the gaps
previously. Then, fix the assembly using the supplied parts and screws.
Move the microphone to the lower enclosure and place the metallic
parts supplied with the frame.
3
Connect the cables to the basic unit and interconnect the additional
modules with the bus as shown in the schema.
5
Place the frame.
© Zennio Avance y Tecnología S.L.
2
Place the assembly inside the flush-mount box and recover the
cables. Fix the module with the screws (included).
4
Fix the blind panel (or additional modules that remain in sight) with
the supplied screws and put the labels with captions next to the buttons.
6
Fix the frame by using the supplied Allen key.
Ed. 1
For more info
GetFace IP
Assembly instructions
www.zennio.com
Page 1 / 2

Advertisement

loading

Summary of Contents for Zennio ZVP-FFRA3

  • Page 1 Place the frame. Fix the frame by using the supplied Allen key. Page 1 / 2 © Zennio Avance y Tecnología S.L. Ed. 1 For more info www.zennio.com...
  • Page 2 Interconnect the additional modules with the bus as indicated in the Place the frames and fix them by using the supplied Allen key. schema and then, fix the additional modules with the supplied screws. Page 2 / 2 © Zennio Avance y Tecnología S.L. Ed. 1 For more info www.zennio.com...

This manual is also suitable for:

Zvp-fbox3