Cedar Ridge CRHQD250T Owner's Operation And Installation Manual page 15

Vent-free gas stove
Table of Contents

Advertisement

Available languages

Available languages

PRESSURE TESTING HEATER GAS CONNECTIONS
1. Open equipment shutoff valve (see Figure
12, page 14).
2. Open main gas valve located on or near
gas meter for natural gas or open pro-
pane/LP supply tank valve.
3. Make sure control knob of heater is in the
OFF position.
4. Check all joints from equipment shutoff
valve to control valve (see Figure 13 or
CAUTION: Do not mix old and
new batteries. Do not mix alka-
line, standard (carbon - zinc), or
rechargeable (nickel - cadmium)
batteries. Do not dispose of
batteries in fire, batteries may
explode or leak.
• Batteries are included.
• Remove batteries when depleted.
• Install/replace the batteries according to the
type and quantity stated in table to the right.
• Do not mix old and new batteries. New bat-
teries should be the same brand for best
results.
• Be sure to observe proper polarity (+/-)
when installing or replacing the batteries.
Damage due to improper battery installation
may void the warranty on the product.
• For long periods of non-operation, remove
batteries from all components for safety.
200029-01A
INSTALLATION
BATTERY INSTRUCTIONS
www.usaprocom.com
14, page 14). Apply a noncorrosive leak
detection fluid to all joints. Bubbles form-
ing show a leak.
5. Correct all leaks at once.
6. Light heater (see Lighting Instructions on
page 17). Check all other internal joints
for leaks.
7. Turn off heater (see To Turn Off Gas Ap-
pliance, page 18).
Unscrew ignitor cap and install a AAA battery
with the + pointing out. Replace cap.
AAA
Battery
Positive
UP
Figure 15 - Installing Battery in Ignitor
15

Advertisement

Chapters

Table of Contents
loading

Table of Contents