Moving the Outdoor Unit
X Select the moving route in advance .
X
X Be sure that moving route is safe from the weight of the outdoor unit .
X
X Do not slant the product more than 30˚ when carrying it . (Do not lay the product down sideways . )
X
X The surface of the heat exchanger is sharp . Be careful not to get injured while moving and installing .
X
When moving with a crane or wire rope
X When moving an outdoor unit to a higher place such as the rooftop .
X
- Fasten the wire rope as seen in the picture .
- Move the outdoor unit with the product packed to prevent possible product
damage during the transportation .
When moving an outdoor unit with hands
X Moving the outdoor unit by lifting up and carrying due to the short travel distance .
X
- Two people should carry the outdoor unit by holding transportation handle .
- Be careful not to damage the heat exchanger of the rear side of the outdoor unit during
transportation .
- Be careful not to get hurt by the sharp surface of the heat exchanger .

Installation and base ground work for an outdoor unit

X Install the outdoor unit 150mm (6 inch) higher than the base ground and install the drain hole to connect the pipe to the
X
drainage .
X When the front fan of an outdoor unit is installed in a place where the average snowfall is more than 150mm (6inch), the
X
discharge duct should be attached to the outdoor unit .
X The concrete foundation should be 1 . 5 times larger than bottom of the outdoor unit .
X
X It is necessary to install wire mesh or steel bar when outdoor units are installed on a soft foundation .
X
X When installing multiple outdoor units at the same place, install the
X
H beam on the base ground .
(When installing a number of outdoor units, you can install it on the
base ground . )
X Install the H beam [150mm (6 inch) x 150mm (6 inch) x t10 : basic
X
specification] or vibration absorption frame to jut out from the base
ground .
X After installing the H beam, apply corrosion protection .
X
X Install a square pad [t=20mm (1 inch) or more] to prevent vibration
X
from the outdoor unit onto the base ground . Place the outdoor unit
on the H beam and fix it with the bolt, nut and washer . (Fix with M10
basic anchor bolt, nut and washer . )
10
Outdoor unit
Anchor bolt
20mm
(1 inch)
Nut, Spring
washer
A
75mm
(3 inch)
or more
Wire rope/straps
Wood palette
Square pad
H beam
A+10~20mm
(0 . 5 ~1 inch) or more

Advertisement

Table of Contents
loading

This manual is also suitable for:

Am036fxmdch/aa

Table of Contents