Burnham K2WTC Installation, Operating And Service Instructions page 87

Condensing high efficiency direct vent gas-fired hot water combi boiler
Table of Contents

Advertisement

L
P2‐1
P5‐2
T1‐5
P3‐5
Ext. 
Limit
Note: DHW Thermostat 
Terminals (#3 & #4)  are not 
shown and are not used. 
Wiring Legend
Factory Wire Harness
PCB Trace/Components
Field wiring
Connector
Screw 
Terminal
Wire Nut
107774-01- 9/17
XI. Wiring
R7910B Boiler  Control
J4‐6
6.3A Slo 
Blow In‐
Line Fuse
P1‐2
J4‐4
J4‐2
Combustion Fan 
(120V Conn.)
1
P3‐8
Internal, non 
replaceable 2 amp
L2‐1
AT140B
L3‐1
CH T'stat
T1‐1
T1‐2
P2‐4
DHW 
Flow Sw.
DFS‐3
DFS‐2
P5‐5
Thermal 
Sump
Boiler 
Fuse
P2‐6 P3‐9
Press. Sw.
Flow Sw.
T1‐6
"Air Proving 
Switch"
P3‐1
EnviraCOM 
 
Connections (if used)
Return Sensor
Supply Sensor
DHW Sensor
Flue Gas Sensor
Figure 11.6: Internal Ladder Diagram
(continued)
120VAC/60Hz/1Ph
J4‐7
P1‐5
System Pump
J4‐5
P5‐1
BP‐1
BP‐2
Boiler Pump
J4‐3
P5‐7
ZV‐1
ZV‐2
 
3‐Way Zone Valve
3
2
L2‐3
L3‐2
J8‐1
J8‐2
J4‐10
J8‐3
J4‐12
Spark
J1‐2
J7‐7
R7910B Boiler Control
J6‐1
P3‐6
J5‐1
J5‐2
P3‐12
J6‐3
J6‐2
J2‐1 (Tach.)
J6‐7
J2‐2 (DC+)
J6‐8
J2‐3 (Fan PWM)
J3‐ECOM1 (D)
J2‐4 (DC‐)
J3‐ECOM2 (R)
J10‐7
J3‐ECOM3 (C)
J10‐8
J8‐11
P4‐10
J8‐4
P4‐11
J8‐5
J8‐6
P4‐1
J8‐8
P4‐4
J8‐9
J3‐A
P4‐7
J3‐B
J8‐10
MB1
+V
P5‐9
J9‐1
P5‐6
J9‐2
J9‐3
J3‐A
J3‐B
MB2
‐V
P4‐2
J9‐4
P4‐5
J9‐5
P4‐8
J9‐6
N
Gnd
Ground screw in 
boiler J‐box
P1‐1
P5‐4
P3‐7
Ground screw 
on boiler frame
P3‐10
P3‐3
Ignitor
P3‐11
P3‐2
P3‐4
¼" Q.C.
 
Condensate 
Trap
Gas Valve
P4‐6
1 (DC+)
2 (Tach.)
P4‐3
Combustion Fan 
P4‐9
4 (PWM)
(DC Conn.)
5 (DC‐)
P4‐12
T1‐8
P2‐2
Outdoor 
P2‐3
T1‐7
Temp
SD+
SD‐
Panasonic 
RD+
GT02 
RD‐
Display
+5V
‐5V
ModBus Connections 
(if used)
Flame 
Rod
87

Advertisement

Table of Contents
loading

This manual is also suitable for:

K2wtc-135b-6t00K2wtc-135bK2wtc-150bK2wtc-180b

Table of Contents