Assembly Of Centrotherm Innoflue Vent Systems - Burnham K2WTC Installation, Operating And Service Instructions

Condensing high efficiency direct vent gas-fired hot water combi boiler
Table of Contents

Advertisement

1.
This boiler has been approved for use with the Centrotherm InnoFlue single wall Polypropylene vent system to be provided
by the installer.
Asphyxiation Hazard. Follow these instructions and the installation instructions included by the
original Polypropylene venting component manufacturers, Centrotherm. Failure to do so could cause
products of combustion to enter the building, resulting in severe property damage, personal injury
or death. Where a conflict arises between Centrotherm instructions and these instructions, the more
restrictive instructions shall govern.
Do not mix vent components or joining methods for listed manufacturers.
Examine all components for possible shipping damage prior to installation.
All condensate that forms in the vent must be able to drain back to the boiler.
2. Assemble the vent system, starting at the boiler:
a. The vent adaptor has three different inside diameters. The middle inside diameter accepts 3" nominal InnoFlue (Figure
7.27). A locking band clamp in the adaptor prevents the vent pipe from coming out of the adaptor once it is installed
and tightened. Lubricate the upper gasket in the vent adaptor with water and insert the first piece of 3" InnoFlue into the
adaptor until it bottoms out. Tighten locking band clamp to secure vent pipe.
b. Assemble the next piece of 3" InnoFlue.
c. For each joint, verify that the gasket is evenly seated in the bell (female) end of the pipe. Lubricate this gasket with
Centrocerin # IACE50. Slide a connector ring over the male end of the pipe to be joined as shown in Figure 7.44. Push
the male end of the next section of pipe into the bell until it bottoms out, then back out 1/4" to provide room for thermal
expansion. Push hook on connecting ring over the bell end of the first section of pipe as shown in Figure 7.44.
d. Assemble the rest of the vent system per the manufacturer's installation instructions, being sure to pitch horizontal
sections back towards the boiler 5/8"/ft.
e. Support each horizontal pipe section with a minimum of one wall strap each and at intervals not exceeding 39in.
60
VII. Venting
H. Assembly of Centrotherm InnoFlue Vent Systems
Figure 7.44: InnoFlue Connector Ring Installation
WARNING
107774-01 - 9/17

Advertisement

Table of Contents
loading

This manual is also suitable for:

K2wtc-135b-6t00K2wtc-135bK2wtc-150bK2wtc-180b

Table of Contents