Burnham K2WTC Installation, Operating And Service Instructions page 23

Condensing high efficiency direct vent gas-fired hot water combi boiler
Table of Contents

Advertisement

VII. Venting
B. Design Requirements Unique to Horizontal Twin Pipe Venting Systems (continued)
Vent Option
Illustrated in Figure
Pipe
Penetration
through
Structure
Material
Nominal
Diameter
Min Equivalent Vent Length:
Models
Max Equivalent Vent Length (Note 1):
Models
Terminal
Option A
(Fittings)
Terminal Option B
(Ipex Low Profile)
Terminal Option C
(DiversiTech HVENT)
Terminal Option D
(Ipex FGV Concentric)
Terminal Option E
(DiversiTech CVENT)
Terminal Option F
(DuraVent Horizontal
Concentric)
Notes:
1. Max vent lengths shown also apply to the intake. For example, Vent Option #1 may have up to 135ft of vent pipe and also up to
135 ft of intake pipe.
2. First 30" of vent and vent Elbow connected to boiler must be CPVC. Downstream vent pipe can be PVC except as noted in text.
3. PVC Terminal coupling and inlet elbow may be offset on snorkels as shown in Figure 7.12.
107774-01- 9/17
Table 7.5: Summary of Horizontal Twin Pipe Venting Options
Vent
Intake
Vent
Intake
Vent
Intake
135
150
180
135
150
180
Vent
Intake
1
2
7.6, 7.7,
7.9, 7.10
7.8
Wall
Wall
Wall
Wall
CPVC/
DuraVent
PVC
PolyPro
(Note 2)
(Rigid)
PVC
PVC
3"
3"
3"
3"
12"
12"
52"
52"
52"
52"
135ft
135ft
135ft
135ft
135ft
135ft
3PPS-12B
3PF-10UV
Coupling
or
w/screen
3PPS-36B
3PF-39UV
(Note 3)
w/screen
Elbow
Elbow
w/screen
w/screen
(Note 3)
Ipex
Not Permitted
#196985
HVENT-3
Not Permitted
Ipex
Not Permitted
196006
CVENT-3
Not Permitted
Not
3PPS-HK
Permitted
3
4
7.9
7.9
Wall
Wall
Wall
Wall
Centro-
Selkirk
therm
Polyflue
InnoFlue
SW
PVC
PVC
3"
3"
3"
3"
12"
12"
52"
52"
52"
52"
135ft
135ft
135ft
135ft
135ft
135ft
ISEP03 or
or
ISEP0339
w/screen
w/screen
Elbow
Elbow
w/screen
w/screen
Not Permitted
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

K2wtc-135b-6t00K2wtc-135bK2wtc-150bK2wtc-180b

Table of Contents