ABB HT563800 Operation Manual page 11

Turbocharging
Table of Contents

Advertisement

NOTICE
© Copyright 2015 ABB. All rights reserved.
Preliminary remarks
Storage of new turbochargers and
spare parts
Replacement components ready for operation
If the 70% display field of the hygrometer (2) has not changed colour
and the package is undamaged, the replacement turbocharger or
replacement cartridge group can be placed into operation without any
prior testing by an ABB Turbocharging Service Station.
Unpacking replacement turbochargers or spare parts
The corrosion protection effect ends after the material is unpacked from
the VCI package.
To avoid the formation of condensation, the surroundings and the content
of the package must have the same temperature during unpacking.
Operation Manual / TPS44-F.. - TPS61-F..
1
1.4
Page 9

Advertisement

Table of Contents
loading

Table of Contents