EnerSys DataSafe 12HX1000F-FR Installation, Operation And Maintenance Instructions

EnerSys DataSafe 12HX1000F-FR Installation, Operation And Maintenance Instructions

Advertisement

Quick Links

®
12HX-FT
Battery Installation, Operation and Maintenance Instructions
Visit us at www.enersys.com

Advertisement

loading

Summary of Contents for EnerSys DataSafe 12HX1000F-FR

  • Page 1 ® 12HX-FT Battery Installation, Operation and Maintenance Instructions Visit us at www.enersys.com...
  • Page 2 Charging is advised if the voltage drops below 2.07 Vpc. or 12.42 volts per Stowing ■ ■ block For proper installation, EnerSys battery racks and cabinets are recommended. ® Maximum total storage prior to installation is two years from date of shipment Attention: Unless otherwise noted, battery racks and cabinets should not be from the factory to the customer when stored at 77°F (25°C).
  • Page 3 ® Torque Charging Current ■ ■ ■ ■ Tighten the M8 connector bolts to 160 in-lbs (18.1Nm). A loose connector can The recommended charging method for DataSafe 12HX-FT batteries is current cause problems in charger adjustment, erratic battery performance, possible limited, constant voltage charging.