EnerSys PowerSafe DDm Installation, Operation & Maintenance Manual

EnerSys PowerSafe DDm Installation, Operation & Maintenance Manual

Conventional & anti-shock stand configurations

Advertisement

RESERVE
POWER
Conventional & Anti-Shock
Stand Configurations
Installation, Operation
& Maintenance Manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PowerSafe DDm and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for EnerSys PowerSafe DDm

  • Page 1 Conventional & Anti-Shock Stand Configurations Installation, Operation & Maintenance Manual RESERVE POWER...
  • Page 2: Table Of Contents

    • Health & Safety Information • Protective clothing - Always wear for Lead-Acid Batteries - EnerSys Ltd. protective clothing. Eye protection • EN 50272-2 and IEC 62485-2 Safety (goggles or visor) should be worn if your Requirements for Secondary Batteries job brings you into contact with acid.
  • Page 3: Battery Location And Accommodation

    2.3 Safety climate will allow. Warning notices complying with current Health & Safety PowerSafe DDm batteries are supplied in a filled and charged legislation should indicate the dangers of unauthorised access. condition so storage time is typically 6 months at 20°C.
  • Page 4: Installation

    However, insulating front covers are • the frames are fitted with flat base plates instead of adjustable supplied as standard when PowerSafe DDm cell are feet. This allows the stand to be securely fixed to the floor using accommodated on seismic UBC Zone 4 stands.
  • Page 5: Commissioning Charge

    9.2 Charging EnerSys must be contacted for advice if an equalising charge is to 9.2.1 Applied voltage level for normal float charge be undertaken. For all normal operating conditions, and particularly where the battery is maintained fully charged continuously in parallel with 9.2.4 Charge current...
  • Page 6: Maintenance

    EnerSys should be contacted for advice when values change by 35% of the initial value. 9.3.2 Short circuit faults •...
  • Page 7: Annexes

    M8 plain washer M8 spring washer M8 nut Insulating nut cap - long M8 x 70 socket HD bolt M8 x 30 HX HD screw Tie-bar Spacer washer Foot assembly M16 lock nut M16 plain washer 12.2 Anti-shock stand runner www.enersys-emea.com...
  • Page 8 SUB5872 SUB5876 SUB5889 SUB5751 DDM100-25 SUB5872 SUB5876 SUB5890 SUB5751 DDM100-27 SUB5872 SUB5876 SUB5891 SUB5751 DDM100-33 SUB5872 SUB5876 SUB5887 SUB5886 SUB5751 DDM125-25 SUB5873 SUB5874 SUB5892 SUB5751 DDM125-27 SUB5873 SUB5874 SUB5893 SUB5751 DDM125-33 SUB5873 SUB5874 SUB5887 SUB5886 SUB5751 *Available upon request www.enersys-emea.com...
  • Page 9 SUB5732 SUB5738 SUB5746 SUB5751 DDM100-25 SUB5732 SUB5738 SUB5747 SUB5751 DDM100-27 SUB5732 SUB5738 SUB5748 SUB5751 DDM100-33 SUB5732 SUB5738 SUB5744 SUB5743 SUB5751 DDM125-25 SUB5733 SUB5901 SUB5749 SUB5751 DDM125-27 SUB5733 SUB5901 SUB5750 SUB5751 DDM125-33 SUB5733 SUB5901 SUB5744 SUB5743 SUB5751 *Available upon request www.enersys-emea.com...
  • Page 10: Battery Record Sheet

    Ambient Temperature (°C) : Battery Charging Current (A) : Average Vpc : Volts Volts Volts Volts Volts Volts Serial Serial Serial Serial Serial Serial cell cell cell cell cell cell Comments : Engineer’s Name : Date of Service : www.enersys-emea.com...
  • Page 11: Notes

    Notes www.enersys-emea.com...
  • Page 12 Level 11 Switzerland 189721 Singapore Tel: +65 6508 1780 Tel: +1 610 208 1991 +1 800 538 3627 Fax: +1 610 372 8613 © 2014 EnerSys ® . All rights reserved. www.enersys-emea.com Trademarks and logos are the property of EnerSys ®...

Table of Contents