GreenWorks Pro UltraPower 60 BL60B00 Operator's Manual

GreenWorks Pro UltraPower 60 BL60B00 Operator's Manual

Advertisement

Quick Links

EN
BLOWER
ES
SOPLADOR
BLC361
OPERATOR MANUAL
MANUAL DEL OPERADOR
www.greenworkstools.com
BL60B00
BL60B210

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UltraPower 60 BL60B00 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for GreenWorks Pro UltraPower 60 BL60B00

  • Page 1 BL60B00 BL60B210 BLOWER OPERATOR MANUAL SOPLADOR MANUAL DEL OPERADOR BLC361 www.greenworkstools.com...
  • Page 2: Table Of Contents

    English 10.4 Remove the battery pack........5 Description......... 2 11 Operation........... 5 Purpose.............. 2 Overview............2 11.1 Start the machine..........5 Important safety instructions...2 11.2 Stop the machine..........5 11.3 Cruise control lever........... 5 Battery-operated power tools...2 11.4 Turbo button............6 Child safety........
  • Page 3: Description

    English DESCRIPTION • Do not operate power tools in an explosive atmosphere, such as in the presence of flammable liquids, gases, or dust. Power tools create sparks that may ignite the dust or PURPOSE fumes. The machine is used to propel air out of a tube to move •...
  • Page 4: Child Safety

    English PROPOSITION 65 • Prevent unintentional starting. Ensure the switch is in the off-position before connecting to battery pack, picking up or carrying the appliance. Carry the power tool with your WARNING finger on the switch or energize power tool that have the This product contains a chemical known to the state of switch on invites accidents.
  • Page 5: Risk Levels

    English WARNING Symbol Explanation Discard all toxic materials in a specified manner to prevent Keep all bystanders at least 50 feet away. contamination of the environment. Before discarding damaged or worn out Li-ion battery, contact your local Failure to keep loose clothing from being waste disposal agency, or the local Environmental drawn into air intake could result in per- Protection Agency for information and specific instructions.
  • Page 6: Install The Blower Tube

    English 10.2 INSTALL THE BLOWER TUBE 10.4 REMOVE THE BATTERY PACK 1. Align the grooves on the rear tube (7) with tabs (6) on the 1. Push and hold the battery release button. blower housing. 2. Remove the battery pack from the machine. 2.
  • Page 7: Turbo Button

    English 1. Pull the cruise control lever (3) clockwise to increase the • Clear the unwanted material out of the air vent with a vacuum cleaner. speed. This will lock the speed at the desired setting. • Do not spray the air vent or put the air vent in solvents. 2.
  • Page 8: Technical Data

    English TECHNICAL DATA ITEMS NOT COVERED BY WARRANTY: 1. Any part that has become inoperative due to misuse, Voltage 60 V commercial use, abuse, neglect, accident, improper maintenance, or alteration; or Air volume 450 CFM 2. The unit, if it has not been operated and/or maintained in Air speed 140 MPH accordance with the owner's manual;...

This manual is also suitable for:

Ultrapower 60 bl60b210

Table of Contents