5.4 Enabling the test

The selected test mode is enabled by pressing the Start Test switch
indicator
displays the running test status.

5.5 Performing a test.

The HFG01 acts as the equipment under test in the harmonics and flicker test
system, and should be connected to the single-phase test power supply as per the
typical test setup used (Figure 5 for example).
Connect the HFG01 power supply
power switch
indicate the HFG01 is operating correctly.
The Test Supply Input cable
socket. Note that if the Test Supply does not provide a safety earth connection as
one of the conductors (e.g. 2-pin Live and Neutral only) then the Chassis Earth
wiring stud
on the front of the HFG01 must be connected to a suitable earth first
(not shown). A suitable earth point may be provided elsewhere on the Harmonics
and Flicker test system.
©York EMC Services
HFG01 Operation Manual
Figure 4: Test Enable switch and indicator
Figure 5: Example of a typical test setup
. The power supply indicator
can be plugged into the Test Supply power output
Page 13 of 21
and turn the HFG01 on by pressing the
should be illuminated green to
Doc. No. Y0321/DOC/038 Rev. 2
and the