Download Print this page

Tycon Power Systems UPSPro UPS-AL48-900 Manual

Advertisement

Quick Links

Wireless Base Stations
and Client Devices
Surveillance Cameras
Communications Tow-
ers
Radio Towers
Congratulations! on your purchase of the UPSPro
Backup Power System. Please take a moment to review this
Qwik Install Guide before use. Please also review other user
guides that are included in the package.
Operation Modes: AC/DC Grid, Solar Ready (May require
blocking diode on solar panels)
Key Features: Industrial Strength, Weatherproof, Key Lock,
24VDC or 48VDC Output, 60A MPPT Battery Charge Controller,
72V 900W AC/DC Power Supply, 8640Wh Backup Capacity
Safety:
For your own protection, follow these safety rules.
Perform as many functions as possible on the ground
Do not attempt to install on a rainy, windy or snowy day or if
there is ice or snow accumulation at the install site or if the
site is wet.
Make sure there are no people, pets, etc. below if you are
working on a roof or ladder.
Recommended Tools: Phillips and Small Flat Blade Screwdriv-
ers, adjustable wrench
Please help preserve the environment and return
any used batteries to an authorized depot
UPS-AL48-900
900W UPSPro
®
®
900W

Advertisement

loading
Need help?

Need help?

Do you have a question about the UPSPro UPS-AL48-900 and is the answer not in the manual?

Questions and answers

Summary of Contents for Tycon Power Systems UPSPro UPS-AL48-900

  • Page 1 UPS-AL48-900 ® 900W UPSPro Wireless Base Stations ▫ and Client Devices Surveillance Cameras ▫ Communications Tow- ▫ Radio Towers ▫ ® Congratulations! on your purchase of the UPSPro 900W Backup Power System. Please take a moment to review this Qwik Install Guide before use. Please also review other user guides that are included in the package.
  • Page 2 WARNING: 60A MPPT Controller is Positive Ground. Do Not Connect Battery Minus to Chassis Ground. Batter- ies should be floating. OK to connect controller ground screw to chassis ground. Qwik Install STEP 1: Prepare a foundation to provide level support for the enclo- sure.
  • Page 3 STEP 4: Install DIN rail to enclosure using the two screws provided. Install MPPT battery charge controller to DIN Rail. STEP 5: Remove the black cover from the MPPT controller to access the wire connection screws. Connect the temperature probe to the con- troller and place it on one of the batteries for temperature compensated charging.
  • Page 4: Specifications

    Specifications Battery Voltage (DC) 24V or 48V (customer configure) Input Voltage (AC) 120/240VAC, 50/60Hz, 5A Max. Capacities (Amp Hr) 24V 360Ah, 48V 180Ah Avail Storage Capacity (WHr) 8640Wh Max Output Power 900W Suggested Max Load 750W MaxInstantaneous Load 20A 500msec Battery Type Valve Regulated Sealed Lead Acid / GEL Battery Life...
  • Page 5 TECH CORNER Additional Information you may find useful Solar Ready: The system is solar ready. You may need to add a 100V 30A blocking diode (Tycon pn 5600059) between the solar pan- el and the PV input to avoid reverse current from the 72V AC/DC power supply going back into the solar panels.
  • Page 7: Limited Warranty

    Remote Station Monitor TPDIN-Monitor-WEB2 • Qty 4: Voltmeters and current meters • Web Based: allows station monitoring over the internet. • Qty 4:10A relays for controlling power to devices, starting a generator, etc. • Measures internal and external tempera- tures •...