Introduction

Thank you for choosing to purchase the Selectronic LD450-12 TRUE
SINE WAVE inverter. Many hours of Research and Development have
gone into the LD450-12 to ensure this inverter provides you with many
years of reliable service

Warranty Card

It is imperative that you complete your warranty card NOW. Your LD450-
12 is covered by a TWO year warranty; this warranty is in addition to your
rights under the trade practices act of your state or territory.
Returning you completed warranty card will enable us to register your
warranty and avoid any possible delays should service be required. If you
have any comments about our product that will not fit on the warranty card
please feel free to drop us a line. Yes, constructive criticism will also be
welcome.

Installation

200mm
200mm
200mm
LD450-12
Inverter
Front
Please leave a clearance of 200mm on all sides and top of the Inverter.
The LD450-12 must be installed in a dry, cool, dust-free environment.
It is recommended that the inverter be placed as far from any radio
receivers as possible.
LD450-12 Manual
200mm
LD450-12 Inverter
1
Selectronic Australia
Large amounts of DC current can be drawn by your LD450-12,
care must be taken.
Fixed Installation
All fixed installation battery connections must be securely bolted,
using stainless steel nuts and bolts. To protect the connection from
corrosion smear a small amount of Vaseline or similar over the joint.
Never place batteries directly onto a concrete floor, place timber or
similar material beneath the batteries.
*System Fuse
Battery Bank
* A system fuse (of at least 45 Amps) should be placed before the battery.
An HRC motor start type is recommended. (See your system designer for
details).
Warning
As a matter of safety, Selectronic strongly recommend that all fixed
installations be designed and installed by appropriately qualified person. The Solar
Energy Industries Association in your state or territory can provide names of accredited
system designers and installers.
The output voltage from an inverter is as lethal as mains electricity.
All AC wiring MUST be carried out by an accredited electrician and must conform to
AS3000 and/or any relevant local standards.
Electrician's Note
• All earth's AC and DC should be bonded
• RFI/Lightning Earth stake should be within 3m of the inverter
• The LD450-12 is suitable for connection to MEN wiring
• Any AC changeover switch must be a 'break before make' type
LD450-12 Manual
To Load
LD450-12
Inverter
2
Selectronic Australia

Advertisement

Table of Contents
loading

Table of Contents