Uni-ram URS1600CE Series User Manual page 15

Table of Contents

Advertisement

MANUAL - SOLVENT RECYCLERS - URS1600CE AND URS2000CE
4) INCREASE LID TENSION (BY ADJUSTING THE SPRING BOLT)
CAUTION:
SHOULD BE DONE ONLY AS A LAST RESORT - FIRST CHECK FOR A WORN LID GASKET, A BLOCK-
AGE IN THE SOLVENT FLOW PATH , LOOSE HINGE BOLTS OR A SET POINT THAT IS TOO HIGH
FOR THE SOLVENT BEING RECYCLED.
Top Nut
Spring Bolt Assembly
5) REPOSITION LID and TIGHTEN HINGE BOLTS
The Hinge bolts can loosen over time, causing the lid to shift off center. This can lead to an inadequate
seal and leaking around the Gasket. Loosen the bolts, reposition the lid and re-tighten the bolts.
6) RECOMMENDED 6-MONTH MAINTENANCE
Vacuum the condenser (see Service Procedure 1).
Clean the solvent f ow path by recycling 3 Gal of clean solvent.
Inspect Distillation Tank for debris, pitting and/or other damage.
Inspect Lid Gasket for wear or damage (see Operating Procedure 11).
Spring Holding Nut
This procedure tightens the Lid by increasing
the tension on the spring attached to the Lid
Bar Spring Bolt Assembly. The Lid and Bolt
Assembly is carefully designed as a Safety
Pressure Relief system to prevent a danger-
ous build up of pressure inside the closed
tank. Do not adjust the Spring Holding Nut
by more than 2 full turns maximum. If 2
full turns do not solve the problem, call for
service.
While holding the top nut with a wrench,
turn the Spring Holding Nut no more than
a 1/2 turn at a time. Turn in a counter-
clockwise direction (as you look down on
it).
After each 1/2 turn, operate the unit nor-
mally and check for leaks.
Hinge
Spring Bolt Assembly
Cross Bar
15
Revised 2017-10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Urs2000ce seriesUrs1600cessUrs2000ssce

Table of Contents