Advertisement

Quick Links

Technical Overview ...................................................................................................................................... 2
I. Important Notes ..................................................................................................................................... 2
II. Before You Purchase/Open .................................................................................................................. 2
III. Space Requirements ............................................................................................................................ 2
IV. Before You Begin Installation ............................................................................................................... 2
V. What is Reverse Osmosis ..................................................................................................................... 2
Installation Introduction ................................................................................................................................. 3
I. Working with Quick Connect Fittings ...................................................................................................... 3
II. Flushing ................................................................................................................................................ 3
Installing Connections .................................................................................................................................. 3
I. Feed Water Connection ......................................................................................................................... 3
II. Drain Clamp .......................................................................................................................................... 3
III. Drilling Faucet Hole - Stainless Steel Sink) .......................................................................................... 3
IV. Mounting the Faucet ............................................................................................................................ 4
V. Storage Tank Assembly ........................................................................................................................ 4
VI. Assembling the System (Photos Below) .............................................................................................. 5
Connecting the RO System .......................................................................................................................... 6
I. Tubing .................................................................................................................................................... 6
System Start Up & Operation........................................................................................................................ 6
I. Plumber Commissioning Steps .............................................................................................................. 6
II. Client can Complete Commissioning ..................................................................................................... 6
III. Automatic Shut Off ............................................................................................................................... 7
IV. Turning the System On/Off .................................................................................................................. 7
Maintenance ................................................................................................................................................. 7
I. Replacement Parts................................................................................................................................. 7
II. Replacement Cartridges ....................................................................................................................... 7
III. Testing Filters ...................................................................................................................................... 7
Troubleshooting ............................................................................................................................................ 8
Additional Extras......................................................................................................................................... 10
I. Water Hammer Arrester ....................................................................................................................... 10
II. Leak Shut Off Kit ................................................................................................................................. 10
GT1-26-4
4 Stage Undersink RO
Contents

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GT1-26-4SCC and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for FSA GT1-26-4SCC

  • Page 1: Table Of Contents

    GT1-26-4 4 Stage Undersink RO Contents Technical Overview ............................2 I. Important Notes ............................. 2 II. Before You Purchase/Open ........................2 III. Space Requirements ..........................2 IV. Before You Begin Installation ....................... 2 V. What is Reverse Osmosis ........................2 Installation Introduction ..........................
  • Page 2: Technical Overview

    Technical Overview I. Important Notes For correct operation of this appliance, it is essential to observe the manufacturer’s instructions. Installation must be carried out by a qualified plumber or authorised technician to comply with Australian Plumbing Codes. This RO system is certified to WaterMark Standards AS/NZS 3497 Under the Certificate number 23247.
  • Page 3: Installation Introduction

    Installation Introduction I. Working with Quick Connect Fittings If you come across a push-fit fitting, you need to firmly push the tubing into the opening until you feel a “click” which signifies that the tubing has pushed through the internal O-ring and is seated correctly.
  • Page 4: Mounting The Faucet

    IV. Mounting the Faucet 1. Refer to the below diagram on the components of the faucet 2. Remove the required fixings of the faucet and thread the faucet through the hole. 3. Re-assemble the faucet fixings in the correct order and tighten into place. 4.
  • Page 5: Assembling The System (Photos Below)

    VI. Assembling the System (Photos Below) 1. Disconnect tubing from the membrane housing cap, unscrew the cap and check the o-rings to ensure they are it working order. 2. Unwrap the Reverse Osmosis Membrane and install it into the membrane housing, ensure that you only handle the membrane by the end stems as shown.
  • Page 6: Connecting The Ro System

    Connecting the RO System I. Tubing Measure a length of white tubing (Inlet Tubing) to be installed between the FWA and the ‘Inlet’ port on the filter system. Cut using a sharp Box Cutter knife or tube cutters. When connecting to the system refer to the ‘Quick Connect Fitting’...
  • Page 7: Automatic Shut Off

    notice a ‘bitter’ or ‘metallic’ taste in the water which is caused by the pH, NOT from any harmful chemicals or plastics. If you are not accustomed to drinking RO water or Alkaline water, you may notice the water may taste ‘strange’ to your individual palate. This is due to the pH level in the water and once your body adjusts, you will no longer have an issue with taste.
  • Page 8: Troubleshooting

    Troubleshooting Problem Possible Cause(s) Solution Leaking between Unseated Tube Check all tubing connections by firmly pushing them into the fitting & tubing fitting. Check that there are no kinks or any obvious issues. If the problem persists, remove the tubing and check for a clean cut with no burs.
  • Page 9 testing equipment and frequently test our units and conduct research. If you feel that there is an issue with your pH, please contact us. Strange taste to 1. Alkaline Filter 1. If you are using an alkaline filter system, the unit requires the water (New (If Applicable) adequate flushing before first use.
  • Page 10: Additional Extras

    2. Faulty Shut Off 2. If it is not an air lock, there may be something wrong with Valve the shut off valve. These parts are warranted for 2 years from date of purchase. Outside this time, it is recommended to replace them.
  • Page 11 FSA will not cover any labour charge incurred by the consumer for the replacement or repair of a product. The warranty is strictly parts only for the parts supplied by FSA. This warranty only applies to the original consumer of the product and is non-transferable.
  • Page 12 ² Other products not manufactured or assembled by FSA are covered under the applicable manufacturer’s warranty. ³ FSA specifies recommended or required filter maintenance – see product information for further details. If a maintenance schedule is not specified, filter maintenance is required at least once per 12 month period.

This manual is also suitable for:

Gt1-26-4

Table of Contents