Download Print this page

ACP RCS511DS Technical Information page 3

Hide thumbs Also See for RCS511DS:

Advertisement

Component Testing Procedures
To avoid risk of electrical shock, personal injury or death; disconnect power to oven and discharge capacitor
before servicing, unless testing requires power.
Illustration
Fuse block / Filter
assembly
Interlock switch assembly
(Mechanical)
Dial Timer
October 2012
©2012 ACP Inc.
!
Component
Power In terminals ......................................
Power Out terminals ...................................
Disconnect wires to switch.
With door open measure resistance from:
Monitor – Terminals 3 - 4 ..................
Primary – Terminals 1 - 2 .................
Secondary – Terminals 5 - 6 .............
With door closed measure resistance from:
Monitor – Terminals 3 - 4 ..................
Primary – Terminals 1 - 2 .................
Secondary – Terminals 5 - 6 .............
After verifying or replacing the module,
re-connect wires to switch and check
operation of monitor circuit before
operating the oven.
Remove leads from timer contact
terminals.
Measure resistance of following
terminals:
1 to 3
1 to 3
2 to M
WARNING
Testing
Timer in OFF position .................
Timer in ON position...................
Timer in OFF or ON position......
3
Results
230 VAC
230 VAC
If no power in, check power outlet
If no power out, check fuses
Indicates continuity
Infinite
Infinite
Infinite
Indicates continuity
Indicates continuity
If timer does not indicate
readings
below, replace timer.
Infinite
Approximately <1
Approximately 13.6 K
(timer
motor)
16500021

Advertisement

loading

This manual is also suitable for:

P2001106mP2001112m