Water temperature controls groups of fixtures - thermostatic (24 pages)
Summary of Contents for Armstrong The Brain DRV80R
Page 1
The installation and service must be performed by a qualified installer. For further information, please call our technical department at +32 4240 9090. Armstrong International Keep this manual with installation Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium for future reference.
Introduction The Brain DRV80 is a registered trademark of Armstrong Hot Water Group, a division of Armstrong International. ® DRV80 features Rada Technology, Rada is a registered trademark of Kohler Mira Limited of Cheltenham, England. The DRV80 is a digital recirculating valve for use as part of a warm water recirculation system within a commercial installation.
Water must have levels of chloramine / chlorine lower than or equal to 4mg/l (ppm) for continual usage. Data Storage Armstrong International shall not accept liability in contract, tort (including negligence or otherwise) for any loss of profits, business or anticipated savings, or loss or corruption of data, or any indirect or consequential loss arising out of the customer's use of DRV80.
Electronics Module). *2 x CR - P2 6V Batteries fitted as supplied. USB Driver and The Brain® DRV80 Control Software are available to download from website, www.armstronginternational.com/brain Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
The Brain® DRV80 conforms to the CE marking requirements. 2004/108/EC EMC Directive 2006/95/EC Low Voltage Directive 2011/65/EU RoHS Directive EN 61326-1 EN 61000-3-2 EN 61000-3-3 EN 61010-1 EN 50581 Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
In order to enter P.O.'s and guarantee delivery dates, a technically accurate and complete IDF is required. The review and acceptance of the information on the IDF by Armstrong: 1. Approves the order for processing which triggers an e-mail confirmation 2.
50 mm 50 mm The Brain DRV80 MUST ONLY ® be installed in this orientation. These clearance dimensions are recommended for maintenance purposes. 150 mm 200 mm Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Do not use oil-based, non-setting joint compounds. To eliminate pipe debris it is essential that supply pipes are thoroughly flushed before connection to the DRV80. Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
BrainScan® or an error relay. If these are required but have not been prefitted, contact Armstrong for further advice. Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium...
Page 17
DRV80 and identified to its purpose. Power Cable Commission the DRV80 and recirculation system using the following instructions... Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Make sure the hot and cold inlet supplies are at their designated pressures and temperatures. Close all the mixed water outlets and turn on the circulating pump. 4mm HEX Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Page 19
Installation Detail Form (IDF). Rada DRV80 Temp. 48˚C Setpoint 49˚C Temp. 48˚C Current Outlet Temperature Setpoint 49˚C Current Setpoint Display as seen during normal operating mode Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Run the DRV80 Control Software by double clicking the icon on the desktop or search for and run the file Brain DRV Programming Software.exe Electronics Module Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
1. A Microsoft Windows based Laptop / PC Computer with The Brain® DRV Programming Software and a USB Cable. 2. A Web Browser via the integral serial port and BrainScan® supplied by Armstrong.* 3. A Building Automation System (BAS). * This option is detailed in a separate Installation, Operation and Maintenance (IOM) Guide for BrainScan®.
Locate the DRV80 by selecting the correct COM Port. The COM Port can be confirmed using the Device Manager utility within the Microsoft Windows OS. Note! Make sure the USB Driver has been installed. Example of Microsoft Windows XP Device Manager Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Page 23
Valve Control - Alters the DRV80’s state ON / OFF. This is required when making specific adjustments to the DRV80’s settings (detailed further in these instructions).. Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
These data fields are read only and can only be changed by updating the DRV80 internal software (only to be performed by a qualified service engineer). Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Change the Adjusted Setpoint back to the default value by clicking Reset to Default. The Adjusted Setpoint value is displayed on the DRV80 as Setpoint. Temp 42˚C Setpoint 43˚C Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Click the preferred Valve Units (°F or °C). Switch Valve Control to OFF. Click Set to transfer the value to the DRV80. Switch Valve Control back ON. Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Page 27
Switch Valve Control to OFF. Click Set to transfer the values to the DRV80. Click Refresh to force display and confirm the updated values. Switch Valve Control back ON. Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Max. (maximum) value or less than the Min. (minimum) value. Example 1 Temp 42˚C Setpoint 43˚C normal operation Temp 42˚C Setpoint 39˚C reset after power failure (to change back to 43°C use Adjusted Setpoint) Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
The Alert and the Error Temp activation can be relayed to a Building Automation System (BAS), a Local Area Network (LAN) or can be accessed online via the integrated Modbus and BrainScan® connection port if connected and programmed accordingly. Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Page 30
Adjusted Setpoint value does not need to be the same as the Default value. Both Adjusted Setpoint and Default can be set within the Max and Min range only. Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium...
Preset Display Alerts The DRV80 is supplied preprogrammed to the customers requirements specified on the Installation Detail Form (IDF). In addition, Armstrong has preset two DRV80 display alerts: Level 1 - Alert preset: 2°C Above Setpoint DRV80 will display Temp High preset: 2°C Below Setpoint DRV80 will display Temp Low...
Failure to complete a sufficient cool down of the blend circuit may result in a Temp High alert or an Error Temp shut down to full cold (see Alerts on pages 29 - 31). Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium...
Page 33
The Disinfection Timeout can be set up to a maximum of 1800 minutes (30 hours). Max. ALERT Above Setpoint Setpoint Setpoint Default Below Setpoint Min. Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain ALERT Cold...
Page 34
(There is a 10 second countdown before full hot is supplied to the blend circuit. The display on the DRV80 changes to confirm the disinfection cycle is active.) Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium...
Page 35
Error Temp. Cycle the power off / on to reset the DRV80, make sure the blend circuit is at a safe temperature before allowing any outlets to be used. Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium...
Change Disinfection Timeout to new value. Click Set. Click Refresh to confirm. Click On under Valve Control. For all further disinfection cycles, use Step by Step - 2. Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Any alteration to the plumbing system that may affect the blend circuit may, as a consequence, also affect the Disinfection Timeout period. Repeat all of Step by Step -1 to maintain a reliable disinfection cycle for the system. Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Gear Drive Assembly (see Preventative Maintenance and Fitting Spare Parts for further details) Do not use Calibration Set for any other reason. If in doubt contact Armstrong for further advice. Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium...
(if the Activate Relay Setpoint 49˚C on Alert box is checked - see page 29) DRV80 Error Messages See Troubleshooting... Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
See Options screen on page 38 for details on how to switch DRV80 for either BrainScan® or Modbus. BrainScan® (not available in Europe) BrainScan® is an optionally selected control module from Armstrong which enables an interface with Building Automation Systems (BAS) which utilize Modbus, Bacnet™ or LonWorks™ protocols via the use of specific ProtoCessor cards.
DRV80 can be programmed to issue suitable alerts and / or system hot water shutoffs (DRV80) and shutdowns (Independent Solenoid Valve). Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium...
DRV80 components should be inspected annually, or more frequently where acknowledged site conditions such as high mineral content water dictate. Each DRV80 has a serial number that is maintained on file with the technical department at Armstrong. For any installation, operation, maintenance or technical support details not covered in this guide, please call our Technical Department quoting the model and / or serial number.
Limited 4mm HEX Warranty. (See back page for full details.) Step 3 Step 4 Note! Retain Clips if replacing electronics module Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Electronics Module DRV80 Electronics Module Spare Parts D57395 Electronics Module D57396 D45781 D51819 Front Cover D77504 Thermistor Loom D57395 D77504 D51818 D51819 D45781 D51819 D51819 Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Page 45
Note! Retain batteries if replacing electronics module Only remove if seal is to be renewed 2 x CR - P2 6V Step 3 Step 4 Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Page 51
Step 7 Step 7a Step 7b 3mm HEX Step 7c Seals shown 1:1 when printed at Full Scale Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Page 52
Step 8 Use one of the 3mm Hex screws to assist in removing the cartridge. 3mm HEX Step 9 Cartridge will fall when loose. Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Page 53
Step 10 D45792 Cartridge Seal Pack (Cartridge not included) Only use silicone based lubricants on rubber seals. Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain continued...
Page 54
Seals shown 1:1 when printed at Full Scale Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Page 55
Step 12 Use one of the 3mm Hex screws to assist in refitting the cartridge. Remove the screw when the cartridge is inserted fully. 3mm HEX Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Page 56
Turn power on to the reassembled DRV80 and connect to a Laptop / PC device. Run the The Brain® DRV Programming Software and go to the Options screen. Click Off under Valve Control. Click Calibration Set. Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain continued...
Page 57
Click Yes to proceed with the calibration. Monitor the DRV80 display. Calibrate HotEnd Valve Reset... Rada DRV80 Temp. 48˚C Setpoint 49˚C Wait for the DRV80 to reset. Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Page 60
• Batteries are at minimal power or flat Replace batteries (see Preventative Maintenance and Fitting Spare Parts on page 42. Do not use Armstrong International rechargeable batteries) Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Page 61
PCB (see page 47). If problem persists, replace PCB and / or LCD. P/N - D45781 LCD, or P/N - D57396 See pages 43-46 Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Water pressure Make sure supply pressures are balanced. Make sure mixed return is flowing correctly to hot water supply inlet. Return to Hot Water Supply Inlet Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Water pressure Make sure supply pressures are balanced. Check for the following: • Air locks • Blocked strainers • Closed valves Return to Hot Water Supply Inlet Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Check water supplies are connected to the correct inlet ports. Check inlet supply temperature Reset DRV80 Turn power off for 10 seconds and restart. Armstrong International Return to Hot Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium Water Supply Inlet armstronginternational.com/brain...
Cool Down start and finish times. • Early abort of disinfection cycle. • Use of a dump valve to speed up cool down time. Return to Hot Water Supply Inlet Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Turn power off for 10 seconds and restart. If the error persists, check the thermistor connections or replace the thermistors. Blend circuit thermometer Check or replace. Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Make sure mixed return is flowing correctly to water heater. Check for the following: • Air locks • Blocked strainers • Closed valves Return to Hot Water Supply Inlet Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Temp 49˚C DRV80 Display Errors on pages 59-61. Error PCB If any other error message is displayed see DRV80 Display Errors on pages 59-61. Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Brightness Setting High Voltage supply exposed when cover is removed If any other error message is displayed see DRV80 Display Errors on page 59 - 61. Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Blocked strainers • Closed isolator valves • Check inlet flow rates are within speci- fied parameters. See Specifications on page 8. Return to Hot Armstrong International Water Supply Inlet Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Check drain plug and seal for wear and / or damage. Make sure drain plug and seal are fitted and tightened adequately. If problem persists, replace both plug and seal. Armstrong International Parc Industriel Des Hants-Sarts, 2ème Avenue No. 4, Haerstal, B-4040, Belgium armstronginternational.com/brain...
Armstrong products, notice of any warranty or other claim relating to the products must be given in writing to Armstrong: (i) within 30 days of last day of the applicable warranty period, or (ii) within 30 days of the date of the manifestation of the condition or occurrence giving rise to the claim, whichever is earlier.