Initial Operation Test - Frigidaire FFHP093WS2 Installation Manual

Table of Contents

Advertisement

Initial operation test

Perform test operation after completing gas leak check at the flare nut
connections and electrical safety check.
1. Connect the power, press the ON/OFF button on the remote controller to turn
the unit on.
2. Use the MODE button to select COOL, HEAT (Only for models with heating
function), AUTO and FAN to check if all the functions work well.
3. When the ambient temperature is too low(lower than 63
be controlled by the remote controller to run in cooling mode, manual
operation can be taken. Manual operation is used only when the remote
controller is disable or maintenance necessary.
o
F), the unit cannot
Auto/OFF
Manual control button
Initial operation test
24

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ffhp123cs2Ffhp123ws2Ffhp183ws2Ffhp183cs2

Table of Contents