Prior To Installation - CellarPro 1800XT Owner's Manual

Hide thumbs Also See for 1800XT:

Advertisement

 Test the unit
BEFORE
1. Let the unit sit upright for 24 hours before turning it on
2. Remove the unit from the box, and remove any materials that have been
packed inside the exhaust cavity. SAVE THE BOX AND PACKING MATERIALS.
3. Let the unit run on a hard, flat surface for no more than 10 minutes.
o Check for any alarms on the display
o Make sure that all fans are spinning.
o Check the cold air discharge from the bottom of the cooling unit - it
should be 8-10°F colder than the readout on the digital display
PLEASE NOTE: This cooling unit is programmed with a
protect its internal components.
 Make sure that the exhaust panel is installed in the correct position – it should
cover either the TOP or the REAR exhaust vent:
o TOP VENT CONFIGURATION:
the hot air will be discharged
through the TOP of the cellar,
install the exhaust panel on the
BACK of the cooling unit (as
shown in the Picture A). In this
configuration, the cavity on TOP
of the cooling unit is OPEN.
Picture B Rear Vent Configuration
I . P r i o r t o I n s t a l l a t i o n
installing it.
If
REAR VENT CONFIGURATION:
o
hot air will be discharged through the REAR
of the cellar, use the exhaust panel to seal
the TOP of the cooling unit (as shown in the
Picture B). In this configuration, the cavity at
the REAR of the CellarPro is OPEN.
4
3-minute delay at startup
Picture A Top Vent Configuration
to
If the
V5.17