5 Installation

5
Installation
5.1

Opening the units

5.1.1

To open the outdoor unit

DANGER: RISK OF ELECTROCUTION
DANGER: RISK OF BURNING
2
5.2

Mounting the outdoor unit

5.2.1

To provide the installation structure

Prepare 4 sets of anchor bolts, nuts and washers (field supply) as
follows:
(mm)
a
Make sure not to cover the drain holes.
INFORMATION
The recommended height of the upper protruding part of
the bolts is 20 mm.
Installation and operation manual
8
45°~90°
3
4× M12
a
NOTICE
Fix the outdoor unit to the foundation bolts using nuts with
resin washers (a). If the coating on the fastening area is
stripped off, the nuts rust easily.
a
5.2.2

To install the outdoor unit

5.2.3

To provide drainage

▪ Make sure that condensation water can be evacuated properly.
▪ Install the unit on a base to make sure that there is a proper
drainage in order to avoid ice accumulation.
▪ Prepare a water drainage channel around the foundation to drain
waste water surrounding the unit.
▪ Avoid drain water flowing over the footpath, so that it does not
become slippery in case of ambient freezing temperatures.
▪ If you install the unit on a frame, install a waterproof plate within
150  mm of the bottom side of the unit in order to prevent the
invasion of water in the unit and to avoid the drain water dripping
(see the following illustration).
NOTICE
If drain holes of the outdoor unit are covered by a mounting
base or by floor surface, raise the unit to provide a free
space of more than 150 mm under the outdoor unit.
Drain holes (dimensions in mm)
a
a
a
45
376
191
a
Drain holes
4× M12
RXYSQ6T8Y1B9
VRV IV-S system air conditioner
4P482276-1 – 2017.04

Advertisement

Table of Contents
loading

Table of Contents