Download Print this page

Monte Carlo Fan Company 3TF24BS Owner's Manual And Installation Manual page 4

Advertisement

10
Safety cable installation
Safety Cable
Lag Screw
safety
cable
washer
lock
3" lag
washer
screw
For Canadian installation and for USA fan and light
kit combinations over 35 lbs, in both flush and
downrod modes the safety cable must be installed
into the house structure beams using 3" lag
screws, washers and lock washers provided. Make
sure that when the safety cable is fully extended
the lead wires are longer than the cable and no
stress is placed on the lead wires.
Note:If Installing The Secondary Support Safety
Cable in the U.S., Do Not Remove Knockouts In
The Outlet Box.
13
House
Black
White
Ground
Connect black and blue wire from fan to Black or (Hot)
wire from house. Connect White wire from Fan to White
(Neutral) wire from house. Connect Ground leads from
mounting bracket and downrod to Ground lead from
house. Refer to Safety Tips section of manual.
16
Next lift the cover ring and install knurled
nuts as shown. Tighten the knurled nuts
securely. The canopy should adjust for
any irregularity in the ceiling or Outlet
box.
© 2013 Monte Carlo Fan Company
11
Make sure the studs protruding from the
bottom of the Mounting bracket are in-
stalled with threads all the way through
the bracket.
14
Fan
Blue
Black
White
Green
Make wire connections to power source using wire nuts
provided. Make sure that no filiments are outside of
the wirenut. After making the wire connections, the
wires should be spread apart with the grounded con-
ductor and the equipment-grounding conductor on one
side of the outlet box and ungrounded conductor on the
other side of the outlet box.
17
Pass leadwires and safety cable
through the canopy.
Flush mount installation
4
12
Hang assembled fan from the mounting bracket in-
stalled to ceiling in previous step. Make sure the fan
is hanging straight. Rotate fan until the tab on the
Mounting bracket engages the slot on the Downrod
Ball. This must be done to prevent the fan body from
rotating when the blades are in motion.
15
Lift Conopy allowing the 2 studs
to protrude through the canopy.
18
Remove side covers from canopy ex-
posing 4 holes. 2 closed holes and 2
open "L" shape holes.
Cover Ring
7/1/2013

Advertisement

loading

This manual is also suitable for:

3tf24 series3tf24wh3tf24rb