Download Print this page

Monte Carlo Fan Company 3TF24BS Owner's Manual And Installation Manual page 3

Advertisement

1
Before you begin installing the fan, Switch
power off at Service panel and lock service dis-
connecting means to prevent power from being
switched on accidentally. When the service dis-
connecting means cannot be locked, securely
fasten a prominent warning device, such as a
tag, to the service panel.
4
Remove keeper from pin.
7
Insert downrod into yoke on top of the Fan
Body. Align the hole in the Downrod with the
hole in the Yoke. Insert the Pin through the
Yoke and Downrod until the point appears on
the other side.
© 2013 Monte Carlo Fan Company
2
Before installing this fan make sure the outlet box is
properly installed to the house structure. To reduce
the risk of fire, electric shock, or personal injury,
mount to outlet box or supporting system acceptable
for fan support. (Mounting must support at least 35
lbs.)
5
Loosen the 2 set screws in yoke
for downrod to slip into yoke.
8
Install the keeper to pin.
3
3
Use metal outlet box suitable for fan support
(must support 35 lbs). Before attaching fan to
outlet box, ensure the outlet box is securley fas-
tened by at least two points to a structural ceil-
ing member ( a loose box will cause the fan to
wabble). Use only the screws provided with
the outlet box.
6
Canopy disk
Canopy
Downrod
Thread leadwires and safety cable
first through the canopy disk,
canopy and last the downrod.
9
Tighten the 2 set screws on the Yoke
once the downrod is in place.
7/1/2013

Advertisement

loading

This manual is also suitable for:

3tf24 series3tf24wh3tf24rb