Panasonic FV-36RLQL1 Operating And Installation Instructions page 17

Table of Contents

Advertisement

Available languages

Available languages

Phase 2
(Fig. H)
[ Installation with trellis and element ]
- Insert the chimney (L) onto the extension (M) and fasten them together with paper adhesive tape (Fig.
- Insert the chimney-extension set (L+M) in the motor chamber (C) (Fig.
- Fasten the chimney-extension set (L+M) onto the trellis (E) with the 4 metric screws M4 (V6 Ø4×7) (Fig.
- Pass the motor connector (B) through the hole of the Range Hood (Fig.
- Lift the Range Hood body so that its lower holes are centred on the 4 - M5 metrics screws of the motor chamber (C)
(Fig.
).
5
- Shift the motor chamber (C) sideways so that the metric screws are positioned on the slots (Fig.
tighten them permanently (Fig.
H
C
2
M
1
).
8
3
E
V6
4 – Ø4×7
L
).
2
).
4
C
5
4
).
1
3
).
6
,
7
) and then
6
7
8
B
17

Advertisement

Table of Contents
loading

Table of Contents