Advertisement

Quick Links

www.ti.com
User's Guide
BQ25170EVM Evaluation Module
Bill Johns
This user's guide describes the characteristics, operation, and use of the BQ25170EVM evaluation module
(EVM). This EVM is designed to help the user evaluate and test the various operating modes of the BQ25170.
This user's guide includes setup instructions for the hardware and software, a schematic diagram, a bill of
materials (BOM), and PCB layout drawings for the evaluation module.
Throughout this user's guide, the abbreviations EVM, BQ25170EVM, BMS033, and the term evaluation module
are synonymous with the BMS033 evaluation module, unless otherwise noted.
1
Introduction.............................................................................................................................................................................2
1.1 Printed Circuit Board Assembly.........................................................................................................................................
Descriptions..................................................................................................................................................................2
2 Test Summary.........................................................................................................................................................................
2.1 Equipment..........................................................................................................................................................................
2.2 Cautions.............................................................................................................................................................................
2.3 Test Instructions.................................................................................................................................................................
Layout......................................................................................................................................................................4
3.2 Schematic..........................................................................................................................................................................
Materials...................................................................................................................................................................8
4 Revision History...................................................................................................................................................................
Trademarks
All trademarks are the property of their respective owners.
Hot surface! Contact may cause burns. Do not touch!
Some components may reach high temperatures >55°C when the board is powered on. The user must
not touch the board at any point during operation or immediately after operating, as high temperatures
may be present.
SLUUCD6A - AUGUST 2020 - REVISED JUNE 2021
Submit Document Feedback
ABSTRACT

Table of Contents

Materials...................................................................................................................4
WARNING
Copyright © 2021 Texas Instruments Incorporated
Table of Contents
BQ25170EVM Evaluation Module
2
3
3
3
3
7
12
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BQ25170EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments BQ25170EVM

  • Page 1: Table Of Contents

    Bill Johns ABSTRACT This user’s guide describes the characteristics, operation, and use of the BQ25170EVM evaluation module (EVM). This EVM is designed to help the user evaluate and test the various operating modes of the BQ25170. This user’s guide includes setup instructions for the hardware and software, a schematic diagram, a bill of materials (BOM), and PCB layout drawings for the evaluation module.
  • Page 2: Introduction

    1 Introduction The Texas Instruments BQ25170EVM is a Li-Ion, Li-Poly and LiFePO4 chemistry battery charger IC for single cell. Charging voltage can be adjusted using external resistors on VSET. Charging current can be set from 60mA to 600mA with external resistor on ISET.
  • Page 3: Test Summary

    This section describes the jumpers and connectors on the EVM as well as how to properly connect, setup, and use the BQ25170EVM. Note that the default jumper setting of headers and switches are marked with two dots to indicate the shorting jumper position. This will put the unit into a single cell Li-Ion configuration, 4.2V at 400mA.
  • Page 4: Board Layout, Schematic, And Bill Of Materials

    3.1 Board Layout The board layout is shown in Figure 3-1 Figure 3-6. Figure 3-1. Top Overlay Figure 3-2. Top Solder BQ25170EVM Evaluation Module SLUUCD6A – AUGUST 2020 – REVISED JUNE 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 5 Board Layout, Schematic, and Bill of Materials Figure 3-3. Top Layer Figure 3-4. Bottom Layer SLUUCD6A – AUGUST 2020 – REVISED JUNE 2021 BQ25170EVM Evaluation Module Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 6 Board Layout, Schematic, and Bill of Materials www.ti.com Figure 3-5. Bottom Solder Figure 3-6. Bottom Overlay BQ25170EVM Evaluation Module SLUUCD6A – AUGUST 2020 – REVISED JUNE 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 7: Schematic

    Board Layout, Schematic, and Bill of Materials 3.2 Schematic The BQ25170EVM schematic is shown in Figure 3-7. Figure 3-7. BQ25170EVM Schematic SLUUCD6A – AUGUST 2020 – REVISED JUNE 2021 BQ25170EVM Evaluation Module Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 8: Bill Of Materials

    RES, 27.0 k, 1%, 0.1 27.0k 0603 RC0603FR-0727KL Yageo W, 0603 RES, 24.0 k, 1%, 0.1 24.0k 0603 RC0603FR-0724KL Yageo W, 0603 BQ25170EVM Evaluation Module SLUUCD6A – AUGUST 2020 – REVISED JUNE 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 9 Harwin hooks, SMT 3.25x1.65mm TP10, TP12, TP13, TP14 BQ25170DSG, DSG0008A DSG0008A BQ25170DSG - 1S Li-Ion Texas Instruments Texas Instruments (WSON-8) SLUUCD6A – AUGUST 2020 – REVISED JUNE 2021 BQ25170EVM Evaluation Module Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 10 RES, 0, 5%, 0.1 W, 0603 RC0603JR-070RL Yageo 0603 RES, 604 k, 0.1%, R15, R17 604k 0805 RT0805BRD07604KL Yageo America 0.125 W, 0805 BQ25170EVM Evaluation Module SLUUCD6A – AUGUST 2020 – REVISED JUNE 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 11 Black Unless otherwise noted in the Alternate PartNumber and/or Alternate Manufacturer columns, all parts may be substituted with equivalents. SLUUCD6A – AUGUST 2020 – REVISED JUNE 2021 BQ25170EVM Evaluation Module Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 12: Revision History

    Changes from Revision * (August 2020) to Revision A (June 2021) Page • Changed Figure 3-1 ............................4 • Changed Figure 3-7 ............................7 • Changed Table 3-1 ............................BQ25170EVM Evaluation Module SLUUCD6A – AUGUST 2020 – REVISED JUNE 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 13 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 14 www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
  • Page 15 www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
  • Page 16 www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
  • Page 17 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2019, Texas Instruments Incorporated...
  • Page 18 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products.IMPORTANT NOTICE Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2021, Texas Instruments Incorporated...
  • Page 19 Mouser Electronics Authorized Distributor Click to View Pricing, Inventory, Delivery & Lifecycle Information: Texas Instruments BQ25170EVM...

This manual is also suitable for:

Bq25170

Table of Contents