www.ti.com
User's Guide
BQ25171EVM Evaluation Module
This user's guide describes the characteristics, operation, and use of the BQ25171EVM evaluation module
(EVM). This EVM is designed to help the user evaluate and test the various operating modes of the BQ25171.
This user's guide includes setup instructions for the hardware and software, a schematic diagram, a bill of
materials (BOM), and PCB layout drawings for the evaluation module.
Throughout this user's guide, the abbreviations EVM, BQ25171EVM, BMS032, and the term evaluation module
are synonymous with the BMS032 evaluation module, unless otherwise noted.
1
Introduction.............................................................................................................................................................................2
1.1 Printed Circuit Board Assembly.........................................................................................................................................
Descriptions..................................................................................................................................................................2
2 Test Summary.........................................................................................................................................................................
2.1 Equipment..........................................................................................................................................................................
2.2 Cautions.............................................................................................................................................................................
2.3 Test Instructions.................................................................................................................................................................
Layout......................................................................................................................................................................4
3.2 Schematic........................................................................................................................................................................
3.3 Bill of Materials.................................................................................................................................................................
4 Revision History...................................................................................................................................................................
Trademarks
All trademarks are the property of their respective owners.
Hot surface! Contact may cause burns. Do not touch!
Some components may reach high temperatures >55°C when the board is powered on. The user
must not touch the board at any point during operation or immediately after operating, as high
temperatures may be present.
SLUUCA3B - JULY 2020 - REVISED JULY 2021
Submit Document Feedback
ABSTRACT
Table of Contents
Materials...................................................................................................................4
WARNING
Copyright © 2021 Texas Instruments Incorporated
Table of Contents
BQ25171EVM Evaluation Module
2
3
3
3
3
10
11
14
1
Need help?
Do you have a question about the BQ25171EVM and is the answer not in the manual?
Questions and answers