ASSEMBLY INSTRUCTIONS
11. Make sure mounting arm (A) is level, then secure
bottom of mounting arm (A) using 8 mm lag bolt (II).
Hardware Used
II
8 mm Lag bolt
Concrete Installation
12. Use mounting arm (A) to mark two mounting hole
locations.
13. Drill two 3/8 in. pilot holes 2-3/4 in. (70 mm) deep at
the marked locations for the mounting holes.
11
x 1
12
13
11
A
II
1
A
Need help?
Do you have a question about the UT-IO-70C and is the answer not in the manual?