ZXSDR R8860 Installation Manual
d. All components are properly installed in position.
e. The inspected goods are placed by category.
2. Handover
After completing the unpacking procedure, representative of customer and project
supervisor should approve and sign the Unpacking for Inspection Report. Both parties
should have a copy of Unpacking for Inspection Report.
– End of Steps –
2-14
SJ-20100722143906-002|02/20/2011(R1.3)
ZTE Proprietary and Confidential