Performing Cabinet-Combination - Zte ZXSDR R8860 Installation Manual

Cdma remote radio unit-8860
Hide thumbs Also See for ZXSDR R8860:
Table of Contents

Advertisement

ZXSDR R8860 Installation Manual
Note:
The RRU in
The description of cabinet-combined connection are as follows:
1. Two ZXSDR R8860 cabinets are connected by two frequency point extension cables.
2. Two ZXSDR R8860 cabinets provides mutual receiving diversity for each other. Each
ZXSDR R8860 is equipped with of a pair of antenna to transmit and receive signals.
The components used in the cabinet-combined installation are described as follows:
1. While selecting the pole-mount installation, refer to Components Used in
Pole-mount Installation); while selecting the wall-mount installation, refer to
Components Used in Wall-mount Installation; while selecting the gantry-mount
installation, refer to Components Used in Gantry-mount Installation.
2. Two frequency point extension cables are prepared.
A.2 Performing Cabinet-combination
Steps
1. Select a proper installation mode (pole-mount installation, wall-mount installation and
gantry-mount) according to the actual conditions to install two ZXSDR R8860.
2.
Connect the two frequency point extension cables as described below:
a. Connect End A of a frequency point extension cable to the RXin interface of a
ZXSDR R8860 and End B to the RXout of the other ZXSDR R8860.
b. Connect End A of the other frequency point extension cable to the RXout of the
ZXSDR R8860 and End B to the RXin of the other ZXSDR R8860.
– End of Steps –
SJ-20100722143906-002|02/20/2011(R1.3)
Figure A-1
means the ZXSDR R8860.
A-2
ZTE Proprietary and Confidential