Test Boiler; Commercial Boilers - Riello GAS 8 P/M Installation, Use And Maintenance Instructions

Forced draught gas burners
Table of Contents

Advertisement

4.8

Test boiler

The burner/boiler combination does not pose any problems if the
boiler is EC approved and its combustion chamber dimensions
are similar to those indicated in the diagram (Fig. 5).
If the burner must be combined with a boiler that has not been EC
approved and/or its combustion chamber dimensions are clearly
smaller than those indicated in the diagram, consult the manufac-
turer.
The firing rates were obtained in special test boilers, according to
standard EN 676.
In Fig. 5 you can see the diameter and length of the test combus-
tion chamber.
Technical description of the burner
11
GB
Example:
Output 1500 Mcal/h: diameter 80 cm - length 2.5 m.
4.8.1

Commercial boilers

The burner/boiler combination does not pose any problems if the
boiler is EC approved and its combustion chamber dimensions
are similar to those indicated in the diagram (Fig. 5).
If the burner must be combined with a commercial boiler that has
not been EC approved (CE mark) and/or its combustion chamber
dimensions are clearly smaller than those indicated in diagram
(Fig. 5), consult the manufacturers.
D44
Fig. 5
20148758

Advertisement

Table of Contents
loading

Table of Contents