Download Print this page

HermanMiller Canvas Office Landscape Installation And Disassembly For Recycling Instructions page 3

Universal work surface leg
Hide thumbs Also See for Canvas Office Landscape:

Advertisement

Universal Leg:
A
Pilot Holes
Wall Attached Work Surface
1. Place Legs (A) onto Work Surface.
2. Position Leg Assembly using dimensions shown.
3. Align 2 holes in each Leg with 2 Pilot Holes in Work Surface.
4. Mark all other holes in Legs.
5. Remove Leg Assembly. Drill Holes. Make sure not to drill thru work surface.
B
Z
© 2013 Herman Miller, Inc. Zeeland, Michigan. Printed in the U.S.A.
® Y, Z and Canvas Office Landscape are among the registered trademarks of Herman Miller, Inc.
Illustrations and specifications are based on the latest product information available at the time of publication.
The right is reserved to make changes in design and specifications at any time, without notice, and also to discontinue products.
A
Pilot Holes
(front)
6. Return Leg Assembly to Work Surface.
  7 . Install 11 Flat Head Screws(B).
Pilot Holes
.38
1.95
Pilot Holes
Freestanding/Peninsula
Work Surface
.38
.50
A
A
1.95
(front)
Part no. 1b6y4f rev C.
3

Advertisement

loading