Electrical connection and commissioning

Before you begin with the installation and commissioning of the
following notes:
• Make sure that the system is disconnected from the power supply.
• Make sure that no one is in the danger zone.
• Check the danger zone and take measures to prevent persons from entering (e.g. erect warning
signs, set up cordons or similar).
NOTE
Laying cables!
 Lay all connection cables and signal lines within the electrical installation space or permanently in
cable ducts.
 Lay the cables and lines so that they are protected against external damages.
 For further information: see EN ISO 13849-2, Table D.4.
Step 1: Replace the defective TMC 66 with the MSI 420.TMC-03
The table below shows the wiring for the existing signals.
Table 4.1:
TMC66
MSI 420.TMC-03
1
T1
2
I1
3
I2
4
I3
5
IQ1
6
IQ2
7
IQ3
8
I4
9
IQ4
10
I5
11
A1/B1/B2
12
A2
13
I6
14
I7
15
Q3
16
n.c.
n.c.
Q4
17/18
Q1
Leuze electronic
Rewiring TMC66 to MSI 420.TMC-03
Designation
SLS activation
SLS input
Start/activation input
Contactor monitoring input
"Error" signal output
"Safety on" signal output
Start 1 active
Start 1 edge
Start 2 active
Start 2 edge
+ 24 V
GND
Control 1
Control 2
Indicator light 1
Indicator light 2
"Error indication" signal output see chapter 5 "Diagnostics mes-
Safety output 1
TMC 66 Legacy
MSI 420.TMC-03
, please observe the
Comment
see chapter 3 "Description of func-
tions"
Only relevant in operating mode 3
and 4
Muting sensor transmitter
Muting sensor receiver
Muting sensor transmitter
Muting sensor receiver
Muting lamp not monitored by the
MSI 420.TMC-03
MSI 420.TMC-03 provides only one
output for the muting lamp
sages"
Semiconductor output (PNP)
10