Efco swaploader SL-105 Parts And Operation Manual page 52

Table of Contents

Advertisement

contact with the jib lockout valve roller. The roller should be depressed by the valve ramp so
that 1/8" to 3/16" of the roller is exposed from the end cap (see illustration below).
ADJUSTMENT
Should the jib lockout valve need adjustment the first step will be to loosen the mount bracket
screws (see illustration above). Reposition the jib lockout valve with respect to the valve ramp
by turning the adjustment screw on the valve mount bracket as follows:
Clockwise Adjustment – Moves the jib lockout valve closer to the valve ramp
Counter-Clockwise Adjustment – Moves the jib lockout valve away from the valve ramp
Once the valve has been moved back into proper adjustment, then tighten up the mount bracket
screws.
PART NUMBER &
SwapLoader
Pt. No.
21P28
Please contact your SwapLoader Distributor or SwapLoader USA should you have any
questions regarding this procedure.
4-6
SPECIFICATION
Work Port Size
3/4-16 ORB (SAE 8)
2-Way, 2-Position N.C.
Spool Type
Section IV: Maintenance 
 
4.0.MAI.SL-105

Advertisement

Table of Contents
loading

Table of Contents