Advertisement

Roof installation

Danger
Disconnect the mains power supply to the unit before performing any work.
Caution
Risk of injury through pinching. Use protective clothing.

Enclosed in the kit:

Systemair Sverige AB · Industrivägen 3, SE-739 30 Skinnskatteberg, Sweden
Phone +46 222 440 00 Fax +46 222 440 99
Installation Guide ODK Roof
Corner brackets
4 pcs for all Topvex
Sheet metal screws with rubber seal
24 pcs for Topvex SR20-35, SC20-60
32 psc for Topvex SR60-100, SC70
Side bracket
2 pcs for Topvex SR20-35, SC20–60
4 pcs for Topvex SR60-100, SC70
Roof parts
2 pcs
3 pcs for Topvex SC70
247576-en_GB- vA002
1 (3)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SR35 and is the answer not in the manual?

Questions and answers

Summary of Contents for SystemAir SR35

  • Page 1 24 pcs for Topvex SR20-35, SC20-60 2 pcs 32 psc for Topvex SR60-100, SC70 3 pcs for Topvex SC70 Systemair Sverige AB · Industrivägen 3, SE-739 30 Skinnskatteberg, Sweden Phone +46 222 440 00 Fax +46 222 440 99 247576-en_GB- vA002...
  • Page 2 Fig. 1 Place the corner and side brackets on top of the air handling unit. Position the roof to make sure the side brackets are in correct position. Use the side bracket as a template and mark the position. Fasten the brackets with the enclosed screws. Systemair Sverige AB · Industrivägen 3, SE-739 30 Skinnskatteberg, Sweden Phone +46 222 440 00 Fax +46 222 440 99...
  • Page 3 (3). (2), observing the bending on the inner edge of the right roof part. Systemair Sverige AB · Industrivägen 3, SE-739 30 Skinnskatteberg, Sweden Phone +46 222 440 00 Fax +46 222 440 99...

This manual is also suitable for:

Sr70Wsd-sr100Sr25Sr20Sr100Sr60 ... Show all

Table of Contents