Indoor Unit Installation(A6 Duct Type) - Midea MTIU-07HWFNX-QRD0W Technical Manual

Multi split type r32 3d inverter control
Table of Contents

Advertisement

3. Indoor Unit Installation(A6 Duct
type)
3.1
Service space for indoor unit
20cm or more
3.2
Hang Indoor Unit
1.Please refer to the following diagrams to locate the four
positioning screw bolt hole on the ceiling. Be sure to mark
the areas where ceiling hook holes will be drilled.
L
Capacity(Btu/h)
7k/9k/12k
18k
2. Install and fit pipes and wires after you have finished
installing the main body. When choosing where to start,
determine the direction of the pipes to be drawn out.
Especially in cases where there is a ceiling involved, align
the refrigerant pipes, drain pipes, and indoor and outdoor
lines with their connection points before mounting the
unit..
3. Install hanging screw bolts.
1) Cut off the roof beam.
2) Strengthen the point at which the cut was made.
Consolidate the roof beam..
4. After you select an installation location,align the
refrigerant pipes, drain pipes, as well as indoor and
outdoor wires with their connection points before
mounting the unit..
5. Drill 4 holes 10cm (4") deep at the ceiling hook
positions in the internal ceiling. Be sure to hold the drill at
a 90° angle to the ceiling.
30cm or more
60cmX60cm
checking orifice
Air filter
Electric control box
Size of mounted plug
L
M
741
360
920
508
6. Secure the bolt using the included washers and nuts.
7. Install the four suspension bolts.
8. Mount the indoor unit with at least two people to
lift and secure it. Insert suspension bolts into the unit's
hanging holes. Fasten them using the washers and nuts
provided.
9. Mount the indoor unit onto the hanging screw bolts
with a block. Position the indoor unit flat using a level
indicator to prevent leaks.
Shockproof cushion
Washer
Hanging screw bolt
Note: Confirm the minimum drain tilt is 1/100 or more.
3.3
Duct and accessories installation
1. Install the filter(optional) according to air inlet size.
2. Install the canvas tie-in between the body and duct.
3. The air inlet and air outlet duct should be far enough
apart enough to a avoid air passage short-circuit.
4. Connect the duct according to the following diagram.
Canvas tie-in Canvas tie-in
Air outlet
Isolation booth
Screw nut
Overhang part
Isolation booth
Air inlet
Air dust filter
checking orifice
Page 115

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents