Download Print this page

Zodiac ZS500 Instruction Manual page 2

Advertisement

Only a person qualified in the technical fields concerned (electricity, hydraulics or refrigeration) is authorised to
perform this procedure. The qualified technician working on the appliance must use/wear personal protective
equipment (such as safety goggles and protective gloves, etc.) in order to reduce the risk of injury occurring
when working on the appliance.
Before handling the machine, ensure that it is switched off and isolated.
1 metal sheet to attach the duct
to the heat pump
1 strip of aluminium adhesive
tape
4 long screws + 4 washers
Installation procedure
• It is vital that this procedure is carried out to the end to ensure that the appliance operates correctly,
• The appliance must be installed in a ventilated technical room, free from freezing temperatures, all traces
of damp and stored pool maintenance products.
• Only the connection kit supplied must be mounted on the blowing machine.
• Bring in the fresh air using the second grill provide in the kit; this fresh air must come directly from the
exterior ambient air and not from a room adjacent to the technical room.
• The exterior air must be brought in by lowering the pressure in the technical room.
• Check that this type of assembly does not hinder the other technical appliances in this room.
Parts supplied
1 duct (3.3 meters maximum) +1 metal sheet to attach the
duct to the heat pump + 1 frame to attach the duct to the wall
in the technical premises
1 metal cable + 1 plastic duct + 1 tensioner
4 self-boring screws
2 grill attachment frames (to be
sealed)
2 grills
EN
1

Advertisement

loading

This manual is also suitable for:

Z550 iq