Commissioning; Commissioning Check List - BONAIRE B009RS Installation Manual

Hide thumbs Also See for B009RS:
Table of Contents

Advertisement

D
C
- R
UAL
YCLE
EFRIGERATED

Commissioning

Commissioning
C
C
OMMISSIONING
HECK
Site
Return panels and covers to their correct position and check that they are well secured.
Ensure all service caps are fitted and correctly tightened.
Attach the electrical wires and pipes to the wall with clamps.
Check all the operations of the air-conditioner. Follow the operating manual for
instruction.
Indoor Coil
Is the condensate drain fixed securely and has it been tested?
Are all ducting connections secured and free from air leaks?
Outdoor Unit
Check for any abnormal noise or vibrations during operation of the air conditioner.
Check that the noise, condensate drainage or air flow does not disturb the neighbors.
Run the dual cycle system for cooling and check operation.
Customer Handover
Explain to the customer together with the operating instructions
How to remove, clean and replace the filter
How to turn the air-conditioner on and off.
How to choose between heating and cooling and how to set the desired temperature.
How to operate the air conditioner from the controller.
Ensure the warranty details are completed correctly. The warranty section is found in
the rear of the owner's manual.
Ensure the model and serial number sticker is inserted in the warranty section of the
owner's manual. The warranty section is found in the rear of the owner's manual.
Installation Instructions
C
C
OOLING
OMPONENT
L
IST
Page 22

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents