YCLE EFRIGERATED OOLING OMPONENT Table of Contents General ............................4 Product Selection Matrix ....................... 4 UNIT DETAILS ..........................5 Outdoor Unit Dimensions ......................5 Outdoor Unit Access and Clearances ................... 6 Indoor Unit Dimensions ......................... 7 Indoor Coil Clearances........................8 UNIT INSTALLATION ........................
The heater provides the controls and fan for the heating and cooling system. The Bonaire Dual Cycle cooling component includes two separate units – indoor coil and outdoor Unit. The two components are interconnected by two refrigerant tubes and an electric cable.
YCLE EFRIGERATED OOLING OMPONENT Dimensions & Clearances UTDOOR CCESS AND LEARANCES When the back is close to the Wall In selecting a proper location, the following criteria The top and the front need to be open. This includes protruding window sills. must be considered: The outdoor unit and the indoor unit must be installed as close to each other as possible, within...
YCLE EFRIGERATED OOLING OMPONENT Unit Installation Unit installation NDOOR Coil Location The indoor coil is designed for installation in conjunction with a duct gas central heater within a ceiling/roof space or other compartment, where there is no influence from outdoor conditions. While selecting the location, the following conditions must be assured: a) The location should assure free flow of the...
YCLE EFRIGERATED OOLING OMPONENT Unit Installation Coil - Floor or Platform Mounting 1. Create a platform using bearers and chipboard. Place the unit platform over load bearing walls or on strategically located trusses in the roof space. 2. Place serrated rubber pads or isolating springs under each corner of the unit to minimize / eliminate any noise transmission.
YCLE EFRIGERATED OOLING OMPONENT Unit Installation ONDENSER NSTALLATION Installation on flat surface (roof, ground, etc) Install outdoor unit support in a position elevated at least 100 mm on a concrete pad, concrete block or wooden beams, in order to allow free water flow underneath.
YCLE EFRIGERATED OOLING OMPONENT Unit Installation Recommendation for Interconnection Tubing Installation Three possible versions are schematically illustrated: 1) The outdoor unit installed above the indoor unit – such installation requires an oil trap in the gas line at the lowest point of the riser. The radius of the oil trap should be as short as possible.
YCLE EFRIGERATED OOLING OMPONENT Unit Installation NSTALLATION WARNING This paragraph describes the necessary steps for setting the unit into operation. Be sure to follow the instructions, to assure proper functioning of the air conditioner. The outdoor unit is pre-charged with the correct amount of refrigerant. In extended runs, for additional refrigerant charge please refer to the outdoor unit name plate.
YCLE EFRIGERATED OOLING OMPONENT Unit Installation 2. Before brazing wrap a wet cloth around pipes next to the indoor unit to prevent hot pipes from melting foam insulation in the unit. Make sure the flame or heat from the flame does not contact the unit casing or wiring, or damage will occur 3.
YCLE EFRIGERATED OOLING OMPONENT Unit Installation VACUATION AND SETTING IN OPERATION a) Connect two charging hoses from the charging set to the outdoor unit as shown in the diagram below. b) Connect the centre hose of the charging set to a vacuum pump. c) CAUTION - turn on the vacuum pump and make sure that the low pressure gauge reading moves from 0 kPa to -100 kPa;...
YCLE EFRIGERATED OOLING OMPONENT Unit Installation DDITIONAL HARGE 1. Each condenser unit is supplied pre-charged for 10 meters of 9.53 (3/8”) liquid line. For additional charge add 57 grams per meter for over and above the specified system pre-charged length. See the unit name plate for this information. DO NOT exceed the maximum equivalent pipe length on each unit.
Use supply wire sizes as per local electrical codes and regulations. Recommended Full Load Recommended Model Circuit Breaker Amps Cable Size B009RS 16.5 4.0mm B012RS 21.8 4.0mm B015RS 32.4 6.0mm B016RT 3 x 32 A 14.8...
YCLE EFRIGERATED OOLING OMPONENT Commissioning Commissioning OMMISSIONING HECK Site □ Return panels and covers to their correct position and check that they are well secured. □ Ensure all service caps are fitted and correctly tightened. □ Attach the electrical wires and pipes to the wall with clamps. □...
Page 24
Manufactured by Climate Technologies ABN 13 001 418 042 26 Nylex Avenue Salisbury, SA 5108 Australia www.climatetechnologies.com.au 6602212/A...