Additional Charge; Drain Line Installation - BONAIRE B009RS Installation Manual

Hide thumbs Also See for B009RS:
Table of Contents

Advertisement

D
C
- R
UAL
YCLE
EFRIGERATED
Unit Installation
A
C
DDITIONAL
HARGE
1. Each condenser unit is supplied pre-charged for 10 meters of 9.53 (3/8") liquid line. For
additional charge add 57 grams per meter for over and above the specified system pre-charged
length. See the unit name plate for this information. DO NOT exceed the maximum equivalent
pipe length on each unit.
2. Service port on the liquid service valve is not supplied on all units.
1. Valve Protection Plug
2. Insert 5mm Hex / Allen key to
open/close the Refrigerant Valve
3. Valve Protection Cap
4. Refrigerant Valve
5. Service Port cap
6. Flare Nut
7. Valve Mounting Bracket
8. Copper Tube
D
L
I
RAIN
INE
NSTALLATION
a. It is recommended to prepare a drainage
point with rigid 20mm plumbing pressure
PVC pipe tube by a qualified technician.
b. The drain run must be installed with a
constant minimum down slope of 2% and
equipped with a trap, at the indoor unit.
c. Install a "P" trap in the drain.
d. Use the 25mm flexible plastic coupling
hose provided to connect from the indoor
unit primary drain point to the "P" trap
and drain pipe. Secure with clamps.
e. To check the system, fill the condense
tray with water and verify its free flow
through the drain line.
Verify that no leaks are present from the
drain line or unit.
Installation Instructions
C
C
OOLING
OMPONENT
Page 18

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents