Fig. 40: Installing The Wall Insert 2; Table 46: Tightening Torque (72002) - ABB Power 845-M Operation Manual

High-pressure stage
Table of Contents

Advertisement

Operation Manual / Power2 845-M / High-pressure stage
9 Disassembly and assembly / 9.13 Installing the wall insert
Fig. 40: Installing the wall insert 2
Part number
Thread and tightening torque
72002
M10x75
30 Nm
Table 46: Tightening torque (72002)
6. Fit a nut (72004) as a safeguard.
7. Remove bracket (90030).
8. Slide in wall insert (77000) as far as it will go.
9. Detach speed measurement cable from provisional holder and insert cable connector
(86515).
10. Fit three studs (72002) again in upper area and tighten.
© Copyright 2022 ABB. All rights reserved.
HZTL4069_EN
Rev.F
March 2022

Advertisement

Table of Contents
loading

Table of Contents