Fig. 19: Control Dimension S - ABB Power 845-M Operation Manual

High-pressure stage
Table of Contents

Advertisement

Operation Manual / Power2 845-M / High-pressure stage
5 Monitoring during operation / 5.3 Speed measurement
Fig. 19: Control dimension S
3. Secure plate with wedge lock washer (86508) and socket screw (86510). Observe tighten-
ing torque.
4. Adjust dimension X until S = 0 mm is reached.
5. Position cable and secure it with rubber grommet (86516).
6. Screw in pressure nut (86505) secured with Loctite® 243. Observe tightening torque.
© Copyright 2022 ABB. All rights reserved.
HZTL4069_EN
Rev.F
March 2022

Advertisement

Table of Contents
loading

Table of Contents