Installation; Transport; Foundation; Electrical Connections - Behringer HBP530A-CNC Operating Instructions Manual

Table of Contents

Advertisement

2 Installation

2.1 Transport

The machine can be suspended for transporting by boreholes at the machine column. By
the transport with the fork truck it is to look for a continues weight distribution on both
forks. The centre of gravity of the machine is in the region of the saw bow.

2.2 Foundation

For a professional assembly the foundation is to be build after the supplemented drawing.
The plainness of the floor should have +0 / -10 mm. An adequate concrete quality is B25.
If necessary the customer has to arrange a static calculation.
The machine must be fixed at the floor with foundation bolts this particularly if is in relation
with roller conveyors and measuring device.
That the coolant does not flows to far backward on the long work piece surfaces, an
assembly with a slight incline to the cutting side is recommended.

2.3 Electrical connections

Attention!
Never do any work at the electrical parts before the electricity is
disconnected.
Make sure that not unauthorised electricity will be switched on.
Before connecting it is to proof, if the operating voltage of the net is identical with the
voltage of the driving motor.
The sawing machine is installed. It is only to feed the power supply cable into the switch
gear cabinet and the cable is to connect at the binding screws L1, L2, L3 and PEN. At
these binding screws it has to be a right hand rotary field. The right turning direction can
be seen by switch on of the hydraulic. If the manometer shows pressure for the plant after
switch on, the rotary direction is correct.
The change of the turning direction is only to attain by changing the two outward ladder of
the connection cable.
After connecting the machine the control voltage is to proof. If the control voltage is higher
than 26 V or less than 22 V the control transformer from the lead side, is to regulate for the
higher or lesser voltage.
Attention!
After an operation time from 1 week, the binding screws of the switchgear
and the binding screws in the switchgear cabinets have to be strongly
tightened.
When a customer uses a Residual Current Circuit-Breaker, he must use a so-called "All
Current Sensitive Residual Current Circuit-Breaker 300mA". A 300mA Residual Current
Circuit Breaker offers protection with indirect contact and also fire protection which is
customary and satisfactory with industrial facilities.
Operating Instructions
HBP530A-CNC
Rev 07.02.11
Page 10
BA85308
Status 46/04

Hide quick links:

Advertisement

Table of Contents
loading