Salford SDD 4063 Assembly And Parts Manual page 13

Table of Contents

Advertisement

ITEM NO. QTY.
ITEM NO. QTY.
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Note: quantities shown are for fifth bar installation on one side only. Double
quantities for complete wing 5th bar installation.
1. Install fifth bar extensions (1 & 2) on wings at locations shown, Retain with
wide u-bolt (4) and 5/8" lock nuts (5). Do not tighten bolts at this time.
2. Attach wing fifth bar tube (3) to extensions with wide u-bolts (4) and 5/8"
lock nuts (5). Verify locations of extensions and fifth bars, then tighten all bolts.
3. On outer most extension attach caster wheel tower (8) and attach to front of
extension with hex bolt (7) and 5/8" lock nuts (5). Attach to middle of extension
with narrow u-bolts (6) and 5/8" lock nuts.
12-2007
Air Drill Parts and Assembly Manual
WING FIFTH BAR INSTALLATION
PART NO.
PART NO.
2
2
T00075
T00075
23" EXTENSION
23" EXTENSION
1
1
T00410
T00410
AIR DRILL OFFSET 23" EXTENSION
AIR DRILL OFFSET 23" EXTENSION
1
1
UC40604114 CAPPED TUBE 4" x 6" x 1/4"W x 290 LG.
UC40604114 CAPPED TUBE 4" x 6" x 1/4"W x 290 LG.
12
12
BU1061
BU1061
U-BOLT 5/8" x 6" x 5 1/2"
U-BOLT 5/8" x 6" x 5 1/2"
32
32
BN10L
BN10L
5/8" NYLOCK NUT NC
5/8" NYLOCK NUT NC
2
2
BU1046
BU1046
U-BOLT 5/8" x 4" x 7 1/2" LG.
U-BOLT 5/8" x 4" x 7 1/2" LG.
4
4
B1060
B1060
5/8"NC x 6" LG. HEX BOLT
5/8"NC x 6" LG. HEX BOLT
1
1
T00415
T00415
BOGEY WHEEL TOWER
BOGEY WHEEL TOWER
Salford Farm Machinery Ltd.
DESCRIPTION
DESCRIPTION
Page 11

Advertisement

Table of Contents
loading

Table of Contents