PAW HeatBloC K34R Installation And Operating Instructions Manual page 19

Hide thumbs Also See for HeatBloC K34R:
Table of Contents

Advertisement

4 Mounting and installation [specialist]
1
2
3
(side view)
sealing ring
2021/07
flange
(top view)
nut
flange
993x0663Mx-mub-en – V01
1. Take off the thermometer handles (A-
2, F-2) and remove the insulating front
shell of the HeatBloC®.
2. Unscrew the nuts on the lower
connections of the HeatBloC® and
take out the sealing rings.
If a PAW modular distribution manifold or
transition connection is used:
3. Put the two nuts over the flanges.
4. Insert the sealing rings into the nuts.
5. Put the HeatBloC® onto the two nuts.
6. Tighten the nuts.
Make sure that the nuts do not get
jammed and that the sealing rings do
not slip.
7. Connect the HeatBloC® to the
installation by using the pipes. The
installation to the piping must be
carried out without any tension.
8. Connect the pump.
9. Carry out a pressure test and check
all thread connections.
10. Mount the insulating front shell and
the thermometer handles (A-2, F-2).
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dn 25Dn 32

Table of Contents