Post-Installation Steps; Powering On The Streetwave - Savari StreetWAVE SW-1000 Installation Manual

Roadside unit
Table of Contents

Advertisement

3 Post-installation Steps

3.1 Powering On the StreetWAVE™

Once you mount the StreetWAVE™ on the location of your choice, ensure the following to
power on the device:
Turn on the power supply to the POE injector.
The "PWR" LED on the StreetWAVE™ unit turns green. If the LED is off or in any other
state, refer to the "Savari StreetWAVE™ Roadside Unit User Guide".
After powering on, the StreetWAVE™ device is ready to use.
For information on using the different features of the device, refer to the Savari StreetWAVE™
Roadside Unit User Guide.
Savari Inc., Confidential
Copyright © Savari, Inc. 2017
StreetWAVE™SW-1000™ Installation Guide
14

Advertisement

Table of Contents
loading

Related Products for Savari StreetWAVE SW-1000

Table of Contents