Mounting Instructions For Snap Ferrite Ring - ABB RE 610 Series Installation Manual

Protection relay
Table of Contents

Advertisement

RE_ 610
5.1.
32
Protection Relay
Installation Manual

Mounting instructions for snap ferrite ring

Install the snap ferrite ring around the wires for current/voltage measurement
as follows:
1. Place the snap ferrite ring on a flat surface. To open the ring, use the key
included in the package by pressing it gently into the key holes on the
snap ferrite ring as shown in Fig. 5.1.-1.
Fig. 5.1.-1
Opening the snap ferrite ring before installation
2. Remove the key from the keyholes by carefully pulling it out with one
hand while holding the snap ferrite ring with the other hand.
3. Place the snap ferrite ring around the wires for current/voltage
measurement and lock the ring by closing it. The snap ferrite ring
should be installed as close to the terminal block as possible. Fig. 5.1.-2
shows the preferred position of the snap ferrite ring after installation.
If the protection relay is installed in a place where it is subject to
vibration, such as on marine applications, the snap ferrite ring
needs to be attached to a stationary part of the switch gear
cubicle. This can easily be done by fastening the snap ferrite ring
to the cubicle wall with a screw.
1MRS752265-MUM
A040185

Advertisement

Table of Contents
loading

This manual is also suitable for:

Reu 610Rem 610Ref 610

Table of Contents