19" Rack Mounting With Rtxp 18 - ABB RE 610 Series Installation Manual

Protection relay
Table of Contents

Advertisement

1MRS752265-MUM
Fig. 4.7.-2
Wall-mounted relay in pulled-out position and rotated
A) Locks the relay to selected position (pushed-in or pulled-out)
B) Knurled-head screw
4.8.
Protection Relay
Installation Manual
50 mm space needed
above and below
the frame for rotating
A
413
B

19" rack mounting with RTXP 18

The relay can be mounted together with a RTXP 18 test switch to a 19" rack
by using a mounting kit. For order number, refer to Chapter 6. Accessories.
The mounting kit contains:
Mounting panel (item 1 in Fig. 4.8.-1)
*
Metallic frame (item 2 in Fig. 4.8.-1) for mounting the RTXP 18 test
*
switch to the panel
A device equipped with optic connections requires a minimum
depth of 180 mm.
For instructions on how to mount the case to the panel, refer to
Section 4.3. Flush mounting.
RE_ 610
Min 50 mm spacing
between two kits
450
A040178
27

Advertisement

Table of Contents
loading

This manual is also suitable for:

Reu 610Rem 610Ref 610

Table of Contents