dosInG (ContInued)
3. Manually Dosing the System with Treatment Chemicals
(Continued)
15. Remove the Baffle Plate (6) by the lifting ring and place it onto a flat surface.
16. Remove the Cartridge Filter (7) and place it onto a flat surface.
17. Now repeat the operations of 11 to 13, in reverse by following the bolt tightening
section on page 26
18. Ensure the nuts on the lid have been tightened to a torque of 40Nm.
19. Manually close the 1" Isolating Valve (12). This will close the BOSS™ X-POT6+ Vessel
(4) to drain.
20. Manually open the 1" Isolating Valve (16) below the Chemical Fill Tundish (15).
21. Decant your water treatment chemicals from the larger drums into an easily
manageable container.
22. Pour the Water Treatment Chemicals into the Tundish (15) and therefore into the
Vessel Body (4) itself.
23. The vessel will hold 10L of Water Treatment Chemicals in total, when you have filled
the BOSS™ X-POT6+ Vessel Body (4), a small amount of Water Treatment Chemicals
will exit through the spout of the Manual Vent and into the Manual Vent Tundish (14).
This over-spill will eventually lead to drain.
24. Manually close the 1" Isolating Valve (16) below the Tundish.
25. Replace the ½" plug and manually close the ½" Manual Vent Isolating Valve (19). This
will close the BOSS™ X-POT6+ Vessel (4) to atmosphere.
26. Slowly manually open the 1" Isolating Valves (1 & 3) on the Dirty Flow into the BOSS™
X-POT6+. This will now let system water into the BOSS™ X-POT6+ Vessel.
27. At the start of the filling procedure, air will escape through the Automatic Air Vent.
This will be signalled by a 'hissing'. When the air is fully omitted from the vessel...
28. Slowly manually open the 1" Isolating Valves (8 & 11) on the Clean Return from the
BOSS™ X-POT6+.
29. Turn the power on to the BOSS™ X-POT6+ unit by turning the Mains ON/OFF Power
Switch (22) through 90
30. Check to see if the power is on. The power to the VEXO
activate it. The screen should now scroll 'System Pump Run' and the pump will be
operational.
31. The Water Treatment Chemicals are now dosed into the main system.
To carry on with further Dosing of Water Treatment Chemicals,
follow instructions: 1 to 8, 10, 19 – 31 as Section, Manually Dose the
System with Water Treatment Chemicals above.
BOSS
X-POT6+ Operation & Maintenance Manual (V1.2 September 2017)
TM
o
.
®
iX-1 Controller (21) will
Page 24