Page 1
Pro SuperPlus Ground Support Equipment (US) ltd., DBA Biomorph, 11 Broadway, New York, NY 10004. Tel and Fax 888 302 3375 info@biomorphdesk.com www.biomorph.com...
Page 2
“Questions? Please call 917.328.8955 for support. IMPORTANT: Any issues at site must be reported to Biomorph immediately at 917 .328.8955, by text or phone and wait on site for response. Also, photos of completed desk(s) must be sent to 917 .328.8955 or vendors@biomorphdesk.com and wait ON SITE for approval. This will avoid potential revisits. Thank you.
Page 3
Assembly Overview Assembly Overview IMPORTANT: DO NOT BUILD THIS TABLE UPSIDE DOWN. FRAME MUST BE BUILT RIGHT SIDE UP , IN PLACE, AND TOPS THEN ATTACHED. If this procedure is not followed then tops will not line up with frame. DO NOT REMOVE PROTECTIVE MATERIAL FROM TOPS UNTIL FINAL ASSEMBLY.
Page 4
Installing Leg-Mounted CPU Holder (optional) Place Leg (A) being installed in Step 3 into Shroud (e). Proceed to Step 4. Align CPU Holder with Shroud Slide CPU Support upward. Tighten screws using Allen and secure using four (4) M6 x Wrench.
Page 5
Leg Assembly (continued) M6 x 12 Screw Qty. 16 Note: Longer end of Foot must face toward front (user) side. Glide Qty. 4 Leg Assembly (continued) M6 x 12 Screw Qty. 8 Glide Qty. 4...
Page 6
Crossbar Assembly LH Side RH Side Use these holes. Use these holes. M6 x 12 Screw Qty. 8 LH Side RH Side Use these holes. Use these holes.
Page 7
Crossbar Assembly (continued) LH Side RH Side Use these holes. Use these holes. M6 Flange Head Nut Qty. 8 M6 x 12 Screw Qty. 8 LH Side RH Side Use these holes. Use these holes.
Page 8
Crossbar Assembly (continued) LH Side RH Side Use these holes. Use these holes. M6 Flange Head Nut Qty. 8 M6 x 12 Screw Qty. 8 LH Side RH Side Use these holes. Use these holes.
Page 9
Crossbar Assembly (continued) M6 x 12 Screw Qty. 4 Crossbar Assembly (continued) M6 x 12 Screw Qty. 4...
Page 10
Top Assembly 5 x 25mm Wood Screw Qty. 62...
Page 11
Electrical Components 45˚ Digital Readout 16mm PH Switch and 45˚ Wood Screw Switch Bracket Qty. 4 Qty 2 45mm PH 45mm PH 3 Port Control Box 2 Port Control Box Wood Screw Wood Screw Qty 1 Qty 1 Qty. 2 Qty.
Page 13
Cable Diagram IMPORTANT: All cables must be tacked up and made neat with supplied cable guides. NO cables may hang down ex- cept those passing through cable chains. Make sure cables have enough slack between surfaces to allow full height adjustment between surfaces. IMPORTANT: Extend desktops to full opposite heights to ensure that cables will travel w/o stress).
Page 14
Questions? Call 888 302 3375 Operating your Biomorph Desk DPF1C control switch for Level2Plus, Maxo Series, and Flexo DPF4T control switch for Plus Series Dual Drive Desks Series desks. DPF1C DPF4T May or may not have Toggle between digital display surfaces Setting Initial Height.
Page 15
Check for obstructions above, below and around the desk that may impede movement through the desk’s full For Biomorph Maxo, Flexo, Level, and Plus Series Desks adjustment range of 22” - 48.5” . If there is anything more than 18” high under either surface then it will cause an...
Need help?
Do you have a question about the Pro SuperPlus and is the answer not in the manual?
Questions and answers